Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
32-SCW-225-16A3/00
6 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H500300690 | FITTING | NIPPLE:PIPE,CS,API 5L,B,SCH XXS | 1 | PCS | 1 | R |
| H500300692 | FITTING | NIPPLE:PIPE,CS,API 5L,B,SCH XXS | 1 | PCS | 1 | R |
| H560501263 | PIPE / TUBE | PIPE,API5L-B,SAW,B36.10M,S.10,16"X108.8M SPLM-D-42-1369003R015D,REV,02,ST.2,IT.01 | 10 | M | 1 | R |
| H560505324 | PIPE / TUBE | PIPE:LN,CS,API 5L,B,SMLS,BE,SCH STD,16IN | 1 | JT | 1 | R |
| H600500425 | FITTING | REDUCER:PIPE,CS,SMLS,A.234,SCH 20 | 1 | PCS | 1 | R |
| H600500426 | FITTING | REDUCER:PIPE,CS,SMLS,A.234,SCH STD | 1 | PCS | 1 | R |