Portal›Maintenance Strategy
Maintenance Strategy Library
Corporate Catalog Profile Master. Use filters to move from portfolio profile to the affected equipment population without loading hundreds of rows into one long page.
Catalog Profiles
453
Corporate master
Fully Approved
411
No profile-level action
Profiles Requiring Action
42
Data quality / reclassification / master update
Equipment on Action Profiles
40.982
Close gate before mass build
Catalog Profile Master453 profiles
| Profile | Profile Text | Equipment Family | Final GMS | Equipment | Strategy Ref | Task Package | Core / Cond. | Status | Implementation Gate |
|---|---|---|---|---|---|---|---|---|---|
| 0101 | TANK, CONE RF, ATM/LOW PRESS | Storage Tank | GMS TANK | 812 | STR-0101 | ST-TANK | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0102 | TANK, DOME RF, ATM/LOW PRESS | Storage Tank | GMS TANK | 52 | STR-0102 | ST-TANK | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0103 | TANK, DOME ROOF, CRYOGENIC | Cryogenic / Refrigerated Storage Tank | GMS TANK - CRYOGENIC | 12 | STR-0103 | ST-TANK-CRYO | 3/3 | APPROVED – MASTER DATA UPDATE | G2 - MASTER DATA UPDATE BEFORE MASS BUILD |
| 0104 | TANK, UMBR.RF. ATM/LOW PRESS | Storage Tank | GMS TANK | 62 | STR-0104 | ST-TANK | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0105 | TANK, FLOATING ROOF | Storage Tank | GMS TANK | 151 | STR-0105 | ST-TANK | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0106 | TANK, OPEN ROOF | Storage Tank | GMS TANK | 94 | STR-0106 | ST-TANK | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0107 | TANK, DEGASSES | Storage Tank | GMS TANK | 10 | STR-0107 | ST-TANK | 3/2 | APPROVED WITH DATA-QUALITY ACTION | G1 - DATA QUALITY ACTION |
| 0108 | TANK, NON METALLIC | Non-Metallic Storage Tank | GMS TANK - NON-METALLIC | 42 | STR-0108 | ST-TANK | 3/2 | APPROVED – MASTER DATA UPDATE | G2 - MASTER DATA UPDATE BEFORE MASS BUILD |
| 0109 | TANK, SPHERICAL, PRESSURE | Pressure Sphere / Pressure Vessel | GMS PRESSURE VESSEL - SPHERE | 51 | STR-0109 | ST-SPHERE | 2/2 | APPROVED – MASTER DATA UPDATE | G2 - MASTER DATA UPDATE BEFORE MASS BUILD |
| 0111 | TANK, SILO/HOPPER | Silo / Hopper | GMS SILO / HOPPER | 35 | STR-0111 | ST-TANK | 3/2 | APPROVED – MASTER DATA UPDATE | G2 - MASTER DATA UPDATE BEFORE MASS BUILD |
| 0112 | TANK, FXD RF W/FLOAT.RF,ATM | Storage Tank | GMS TANK | 40 | STR-0112 | ST-TANK | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0199 | TANK, MISCELLENEOUS | Storage Tank | GMS TANK | 185 | STR-0199 | ST-TANK | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0201 | HEAT EXCH., FIXED TUBE | Heat Exchanger | GMS HEAT EXCHANGER | 721 | STR-0201 | ST-HX | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0202 | HEAT EXCH., FLOATING HEAD | Heat Exchanger | GMS HEAT EXCHANGER | 1.593 | STR-0202 | ST-HX | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0203 | HEAT EXCH., "U" TUBE | Heat Exchanger | GMS HEAT EXCHANGER | 757 | STR-0203 | ST-HX | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0204 | HEAT EXCH., SPIRAL & COIL TYPE | Heat Exchanger | GMS HEAT EXCHANGER | 252 | STR-0204 | ST-HX | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0205 | HEAT EXCH., COOLING TOWER | Cooling Tower | GMS COOLING TOWER | 62 | STR-0205 | ST-COOLING | 3/2 | APPROVED – MASTER DATA UPDATE | G2 - MASTER DATA UPDATE BEFORE MASS BUILD |
| 0206 | HEAT EXCH., PLATE TYPE | Heat Exchanger | GMS HEAT EXCHANGER | 16 | STR-0206 | ST-HX | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0207 | HEAT EXCH., FIN TYPE | Air-Cooled Heat Exchanger (ACHE) | GMS AIR-COOLED HEAT EXCHANGER | 1.104 | STR-0207 | ST-ACHE | 2/2 | APPROVED – MASTER DATA UPDATE | G2 - MASTER DATA UPDATE BEFORE MASS BUILD |
| 0208 | HEAT EXCH., BOX TYPE | Heat Exchanger | GMS HEAT EXCHANGER | 79 | STR-0208 | ST-HX | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0209 | HEAT EXCH., DOUBLE PIPE TYPE | Heat Exchanger | GMS HEAT EXCHANGER | 74 | STR-0209 | ST-HX | 3/2 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0299 | HEAT EXCH., MISCELLENEOUS | Heat Exchanger | GMS HEAT EXCHANGER | 443 | STR-0299 | ST-HX | 3/2 | APPROVED WITH DATA-QUALITY ACTION | G1 - DATA QUALITY ACTION |
| 0301 | COLUMN, FRACTIONATOR | Process Column | GMS COLUMN | 87 | STR-0301 | ST-COLUMN | 3/1 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0302 | COLUMN, DRIER NON CATALYTIC | Process Column | GMS COLUMN | 16 | STR-0302 | ST-COLUMN | 3/1 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
| 0303 | COLUMN, STRIPPER | Process Column | GMS COLUMN | 160 | STR-0303 | ST-COLUMN | 3/1 | APPROVED | G3 - READY FOR TASK / PLAN ENGINEERING |
Halaman 1 / 19