Criticality & SECE Governance

Criticality and SECE are managed as two independent engineering axes. H / I / M / L / Z governs maintenance treatment; SECE adds mandatory assurance requirements and is never overridden by low production criticality.

Corporate Criticality Portfolio

Click any criticality class to drill into the equipment register.

223.236 standardized
1.774 non-standard record(s) require master-data correction before controlled strategy or plan build.

SECE Assurance Layer

SECE is a barrier-assurance requirement independent from H/I/M/L/Z. The current source provides SECE markers and plan registration evidence.

Rule: Z can be screened as an RTF candidate only after legal, integrity, SECE, hidden-function and consequential-damage gates are cleared.

How Criticality and SECE Drive Maintenance Development

1 · Asset Criticality

Confirm H/I/M/L/Z as the governing equipment criticality.

2 · SECE Check

Evaluate barrier / assurance obligations independently.

3 · Strategy Treatment

Apply the relevant criticality treatment and mandatory assurance.

4 · SAP Evidence

Build controlled task, plan and execution evidence.

RU Criticality & SECE Landscape

Actual population mix, SECE count and plan coverage by refinery unit.

Criticality Treatment Matrix

Full-width matrix to keep each treatment readable.

Strategy ElementHIMLZ
Inspection / Integrity
Physical condition, degradation, containment/integrity assurance
High assurance; Core required, Conditional promoted when technically applicableHigh assurance; Core required, Conditional promoted when technically applicablestandard reference strategy by Catalog ProfileRetain integrity/code obligations; optimize low-value routine workKeep only legal/integrity/secondary-damage obligation; otherwise RTF candidate
Preventive Maintenance
Failure-mode-relevant servicing / routine preventive action
High assurance; Core required, Conditional promoted when technically applicableHigh assurance; Core required, Conditional promoted when technically applicablestandard reference strategy by Catalog ProfileOptimize / Conditional; remove low-value task with evidenceDefault omit / RTF candidate unless low-cost task prevents secondary damage
Condition / Performance Monitoring
Detect degradation before functional failure
High assurance; Core required, Conditional promoted when technically applicableHigh assurance; Core required, Conditional promoted when technically applicablestandard reference strategy by Catalog ProfileOptimize / Conditional; remove low-value task with evidenceDefault omit / RTF candidate unless low-cost task prevents secondary damage
Functional / Proof / Performance Test
Demonstrate function / protective performance
High assurance; Core required, Conditional promoted when technically applicableHigh assurance; Core required, Conditional promoted when technically applicablestandard reference strategy by Catalog ProfileRetain where hidden/protective function requires assuranceKeep only hidden/protective/SECE function; otherwise RTF candidate
Calibration / Metrology
Demonstrate measurement accuracy / traceability
High assurance; Core required, Conditional promoted when technically applicableHigh assurance; Core required, Conditional promoted when technically applicablestandard reference strategy by Catalog ProfileRetain only where accuracy requirement existsKeep only legal/quality/SECE accuracy requirement; otherwise RTF candidate
Restoration / Overhaul
Restore condition/performance after trigger
Condition/OEM/run-hour/TA only; no criticality-only calendar overhaulCondition/OEM/run-hour/TA only; no criticality-only calendar overhaulCondition/OEM/run-hour/TANo routine overhaul; condition trigger onlyNo routine overhaul; corrective/condition only
Statutory / Certification
Meet legal / authorized inspection requirements
REQUIRED where applicableREQUIRED where applicablestandard reference strategy by Catalog ProfileREQUIRED where applicableKeep legal requirement; otherwise RTF candidate
Run-to-Failure
Accept failure after technical and consequence screening
PROHIBITED / formal exception onlyPROHIBITED / formal exception onlyConditional only after consequence/redundancy screeningRTF candidate after screeningDEFAULT RTF CANDIDATE after technical screening

SECE Assurance Rules

Rules are shown as equal-width cards.

Criticality / SECE Register by RU