Engineering changes are controlled at strategy, task-list and maintenance-plan level before SAP activation. This page shows the corporate SAP implementation rules, RASCI and open action register.
Controlled Engineering Change
Strategy → task → plan → master data → SAP activation
8
SAP build rules
13
RASCI activities
43
open actions
-
SECE marker reviews
SAP PM Build Standard
| Seq | Object | Mandatory Data | Engineering Rule | Z Rule | SECE Rule | Gate | Owner |
|---|---|---|---|---|---|---|---|
| 1 | Technical Object | Equipment/FLOC, Catalog Profile, H/I/M/L/Z, SECE flag | No plan on invalid technical object. | Z can proceed to RTF screening rather than HOLD. | SECE flag from ATA must be carried to plan/task assurance. | G0 | Master Data |
| 2 | Reusable Task List | Standard Task ID, operations, method, acceptance criteria | Reuse standard task; do not duplicate locally without change control. | Z non-SECE may have no preventive task after RTF approval. | SECE assurance task retains tag-level pass/fail evidence. | G2 | Maintenance Engineering |
| 3 | Task Applicability | Core / Conditional / HOLD + tag context | Conditional task requires documented applicability decision. | For Z, proactive task needs explicit technical/economic justification. | SECE may make an otherwise low-criticality assurance task mandatory. | G2 | Reliability / Discipline |
| 4 | Maintenance Plan | Plan plan pattern, type, scheduling indicator | Create plan only when routine scheduled call is needed. | Approved RTF = no preventive plan. | SECE due control must preserve assurance requirement. | G3 | Planner / SAP |
| 5 | Cycle / Trigger | RBI/SIL/OEM/statutory/condition/counter/time basis | No arbitrary calendar interval. | Do not create calendar PM simply because tag is Z. | Use applicable SECE assurance requirement in addition to criticality. | G3 | Interval Owner |
| 6 | Maintenance Item | Technical object + task list + call object | Only approved tasks attached. | RTF tags do not receive preventive maintenance items. | SECE applicable task cannot be removed without change control. | G4 | SAP Master Data |
| 7 | Call Object | None / Notification / Package WO / Individual WO / Corrective | Keep SAP lean while preserving work control. | RTF uses corrective workflow on failure. | Grouped SECE work must retain individual evidence. | G4 | Planner |
| 8 | Activation | Start date / call horizon / first call / status | Stagger rollout; SIT/UAT first calls before activation. | Avoid generating legacy PM on approved RTF population. | No unintended overdue SECE call on activation. | G5/G6 | Maintenance Manager |
Governance RASCI
| Activity | Reliability | Inspection | Maintenance | Planner | Operation | Engineering / Safety | SAP / Master Data | Manager |
|---|---|---|---|---|---|---|---|---|
| Asset taxonomy / Catalog Profile validation | R | C | C | I | C | S | R | A |
| Criticality H/I/M/L/Z validation | R | C | C | I | C | S | I | A |
| SECE category normalization from ATA | R | C | C | I | C | S | I | A |
| Maintenance Strategy definition | R | S | S | C | C | C | I | A |
| Tasklist design | R | R* | S | C | C | C | I | A |
| Task applicability by tag | R | R* | S | C | C | S | I | A |
| Frequency / trigger approval | R | R* | C | C | C | S | I | A |
| Plan plan pattern / packaging | R | C | S | R | C | I | S | A |
| SAP Task List build | C | C | C | C | I | I | R | A |
| SAP Maintenance Plan build | C | C | C | R | I | I | R | A |
| SIT / UAT / first call QA | R | C | R | R | C | I | R | A |
| Effectiveness review / change control | R | C | C | C | C | S | I | A |
| Change-Control Rule | - | - | - | - | - | - | - | - |
Change-Control Rules
2. Every task change must identify reason, evidence, risk impact, approval and affected tags.
3. Interval extension/reduction must have technical basis: RBI/SIL/OEM/P-F/degradation/history/operating context.
4. Deleting PM for Z requires RTF screening result, not only criticality code.
5. SECE assurance task removal/change requires explicit engineering approval and traceable evidence.
Open Engineering / Master-Data Actions
43 actions| Type | ID | Object | Family / Group | Equipment | Status | Gap / Issue | Required Action |
|---|---|---|---|---|---|---|---|
| CATALOG PROFILE | 0103 | TANK, DOME ROOF, CRYOGENIC | Cryogenic / Refrigerated Storage Tank | 12 | APPROVED – MASTER DATA UPDATE | Current generic API 653 basis is insufficient for cryogenic/refrigerated tank systems. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0107 | TANK, DEGASSES | Storage Tank | 10 | APPROVED WITH DATA-QUALITY ACTION | Verify whether 'degasser tank' is truly a storage tank or a process vessel; service determines inspection code. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0108 | TANK, NON METALLIC | Non-Metallic Storage Tank | 42 | APPROVED – MASTER DATA UPDATE | Do not automatically apply API 653 to non-metallic tank construction. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0109 | TANK, SPHERICAL, PRESSURE | Pressure Sphere / Pressure Vessel | 51 | APPROVED – MASTER DATA UPDATE | Major taxonomy correction: pressure sphere should not be governed as API 653 atmospheric storage tank. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0111 | TANK, SILO/HOPPER | Silo / Hopper | 35 | APPROVED – MASTER DATA UPDATE | Silo/hopper is not equivalent to hydrocarbon storage tank; inspection/maintenance basis must follow structure and discharge mechanism. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0205 | HEAT EXCH., COOLING TOWER | Cooling Tower | 62 | APPROVED – MASTER DATA UPDATE | Major reference correction: cooling tower is not governed by API 510/API 660 pressure heat-exchanger practice. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0207 | HEAT EXCH., FIN TYPE | Air-Cooled Heat Exchanger (ACHE) | 1.104 | APPROVED – MASTER DATA UPDATE | Correct API reference from generic API 660 to API 661 for ACHE. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0299 | HEAT EXCH., MISCELLENEOUS | Heat Exchanger | 443 | APPROVED WITH DATA-QUALITY ACTION | Miscellaneous exchanger profile should be split by technology before detailed cleaning/inspection task assignment. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0403 | VESSEL, NON PRESSURE VERTICAL | Non-Pressure Process Vessel | 212 | APPROVED – MASTER DATA UPDATE | Reference correction: non-pressure vessel should not automatically use API 510. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0404 | VESSEL, NON PRESSURE HORIZ. | Non-Pressure Process Vessel | 63 | APPROVED – MASTER DATA UPDATE | Reference correction: non-pressure vessel should not automatically use API 510. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 0499 | VESSEL, MISCELLENEOUS | Pressure / Process Vessel | 362 | APPROVED WITH DATA-QUALITY ACTION | Miscellaneous vessel profile: verify pressure class, construction and service before selecting inspection code. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 1699 | PRIME, MOVER, MISC | Turbine / Prime Mover | 1 | APPROVED WITH DATA-QUALITY ACTION | Prime mover subtype not defined; confirm steam/gas/expander/engine technology. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 1820 | PUMP, BLOW CASE | Pump | 5 | APPROVED WITH DATA-QUALITY ACTION | Pump subtype is insufficiently defined; confirm technology before assigning detailed OEM/API maintenance basis. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 1829 | PUMP, PUMPING UNIT | Pump | 5 | APPROVED WITH DATA-QUALITY ACTION | Pump subtype is insufficiently defined; confirm technology before assigning detailed OEM/API maintenance basis. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 1899 | PUMP, MISC | Pump | 211 | APPROVED WITH DATA-QUALITY ACTION | Pump subtype is insufficiently defined; confirm technology before assigning detailed OEM/API maintenance basis. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 1901 | BLOWER | Blower | 215 | APPROVED WITH DATA-QUALITY ACTION | Generic blower cannot be assigned API 617/618 without technology confirmation. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 1909 | COMPRESSOR, ROTARY | Rotary Compressor | 51 | APPROVED WITH DATA-QUALITY ACTION | Generic rotary compressor profile: identify screw/lobe/vane/liquid-ring subtype before detailed maintenance basis. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 1910 | BLOWER, SOOT | Boiler Sootblower | 1.046 | APPROVED – MASTER DATA UPDATE | Sootblower should not inherit generic compressor/blower standards. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 1999 | COMPRESSOR, FAN&BLOWER, MISC. | Compressor / Fan / Blower Misc. | 38 | APPROVED WITH DATA-QUALITY ACTION | Combined compressor/fan/blower profile is too broad for a single technology-specific maintenance basis. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 3699 | SAFETY & RELIEVE VALVE, MISC | Pressure Safety / Relief Valve | 2.662 | APPROVED WITH DATA-QUALITY ACTION | High-population miscellaneous profile; split into technical subtypes before detailed PM task standardization. Previous combined 'Functional Test/Calibration' wording was over-broad; calibration is not applicable to this equipment class. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 3999 | STEAM TRAP & STRAINER, MISC. | Steam Trap / Strainer Misc. | 11 | APPROVED WITH DATA-QUALITY ACTION | - | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 4099 | PIPING, MISC. | Process Piping | 15.407 | APPROVED WITH DATA-QUALITY ACTION | 15,286 tags in PIPING MISC. limits damage-mechanism/RBI precision; identify material/service/corrosion circuit at lower master-data level. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 5307 | WATER POLUTION CONT. EQP. | Pollution / Spill Response Equipment | 1 | MASTER DATA REFINEMENT REQUIRED | Catalog description does not clearly represent fire-fighting equipment; confirm actual asset function before assigning NFPA-based tasks. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 5399 | FIRE FIGHTING EQP. MISC. | Fire Fighting Equipment | 1.910 | MASTER DATA REFINEMENT REQUIRED | 1,921 tags in 'Fire Fighting Equipment Misc.' is a major master-data gap. Split into extinguisher/hydrant/hose/monitor/pump/suppression/other subtypes before PM task build. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 6104 | EFFLUENT WATER TREAT PLANT | Wastewater Treatment Package / Plant | 2 | APPROVED – MASTER DATA UPDATE | System-level asset. Decompose pumps/blowers/instruments/tanks into equipment-level strategies; keep plant-level PM only for integrated checks. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 6503 | RETAINING WALL | Civil Retaining Wall | 1 | APPROVED – MASTER DATA UPDATE | Retaining wall should not automatically be treated as coastal/shore protection. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 6899 | INDICATOR, MISC. | Indicator | 4.116 | APPROVED WITH DATA-QUALITY ACTION | High-population miscellaneous profile; split into technical subtypes before detailed PM task standardization. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 7111 | LIMITER,SWITCH & ANNUNCIATORS | Instrument Auxiliary / Converter / Annunciator | 5.466 | APPROVED WITH DATA-QUALITY ACTION | Profile mixes limiters, switches and annunciators; calibration applies to some devices but not all. Split subtype if task-level standardization is required. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 7204 | PRINTER & PLOTTER | Control System Peripheral | 42 | APPROVED – MASTER DATA UPDATE | Printer/plotter should not inherit the same maintenance strategy as DCS CPU/PLC controllers. Previous combined 'Functional Test/Calibration' wording was over-broad; calibration is not applicable to this equipment class. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 7299 | COMPUTER,DCS & PLC , MISC | DCS / PLC / Control Computer | 314 | APPROVED WITH DATA-QUALITY ACTION | High-level miscellaneous DCS/PLC profile: split workstation/server/network/PLC/I/O subtypes before lifecycle task standardization. Previous combined 'Functional Test/Calibration' wording was over-broad; calibration is not applicable to this equipment class. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 7402 | HALON SYSTEM | Fire & Gas Detection / Alarm / Deluge System | 2 | APPROVED WITH DATA-QUALITY ACTION | HALON system is legacy/obsolete in many jurisdictions; verify continued regulatory acceptability, agent availability and replacement plan. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 7499 | FIRE/GAS DETECT/CONT.SYS. MISC | Fire & Gas Detection / Alarm / Deluge System | 1.843 | APPROVED WITH DATA-QUALITY ACTION | 1,900 tags in a miscellaneous Fire/Gas profile is too broad for final task design; split by detector, panel, alarm, deluge and suppression subtype. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 7602 | TRASMITTER | Detector / Switch / ESD Instrument | 383 | APPROVED WITH DATA-QUALITY ACTION | Catalog text duplicates 'transmitter' inside detector/switch group; verify whether this is an ESD/SIS-specific transmitter family. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 8699 | SWITCHGEAR, MISC. | Switchgear | 2.739 | APPROVED WITH DATA-QUALITY ACTION | 1,457 tags in SWITCHGEAR MISC. should be reviewed for voltage/breaker technology to define correct outage-test scope. Final review adds explicit inspection/integrity element. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 8704 | GENERATOR, WELDING, AC/DC | Welding Generator / Power Source | 30 | APPROVED – MASTER DATA UPDATE | Treat as welding power source; generator mechanical overhaul logic may be excessive unless an engine-driven unit is confirmed. Previous combined 'Functional Test/Calibration' wording was over-broad; calibration is not applicable to this equipment class. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. Final review adds explicit inspection/integrity element. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 8705 | GENERATOR, EXCITER | Generator Excitation System | 15 | APPROVED – MASTER DATA UPDATE | Exciter is an electrical excitation/control system, not a generator requiring generic mechanical overhaul. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. Final review adds explicit inspection/integrity element. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 8904 | TRANSFORMER, WELDING | Welding Transformer / Power Source | 1 | APPROVED – MASTER DATA UPDATE | Welding transformer should be maintained as a welding power source, not as a grid/distribution transformer. Previous combined 'Functional Test/Calibration' wording was over-broad; calibration is not applicable to this equipment class. Final review adds explicit inspection/integrity element. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 9199 | PANEL, MISC. | Electrical Panel | 1.878 | APPROVED WITH DATA-QUALITY ACTION | 1,697 tags in PANEL MISC. is too broad for standardized electrical test scope; split by panel function/voltage/protection content. Final review adds explicit inspection/integrity element. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 9304 | DC PWR,CHAT.PROTEC,IMPRE CRNT | Cathodic Protection System | 185 | APPROVED – MASTER DATA UPDATE | Major taxonomy correction: impressed-current cathodic protection is not a UPS/battery-charger asset. Final review adds explicit inspection/integrity element. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 9305 | DC PWR,SODIUM HYPOCHLO.GENTR. | Sodium Hypochlorite Generation Package | 4 | APPROVED – MASTER DATA UPDATE | Major taxonomy correction: sodium-hypochlorite generator is a process/electrochemical package, not generic DC power equipment. Final review adds explicit inspection/integrity element. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 9807 | RIG,ACCUMULATOR/BOP | Accumulator / BOP Package | 1 | MASTER DATA REFINEMENT REQUIRED | Atypical refinery BOP/rig profile; confirm whether tag is miscoded or genuinely drilling-service equipment before PM build. Previous combined 'Functional Test/Calibration' wording was over-broad; calibration is not applicable to this equipment class. Previous overhaul element could be read as blanket scheduled overhaul; final basis makes restoration condition/run-hour/TA-driven. | Close engineering/master-data action before mass SAP build. |
| CATALOG PROFILE | 9999 | General Catalog Profile | Unclassified Asset | 1 | RECLASSIFY BEFORE PLAN BUILD | General Catalog Profile 9999 cannot support engineering maintenance strategy. Reclassify before any maintenance plan is created. | Close engineering/master-data action before mass SAP build. |
| TASKLIST | ST-TANK-CRYO-CERT-02 | Cryogenic / Refrigerated Storage Tank Statutory / Authorized Inspection | Cryogenic / Refrigerated Storage Tank | 0 | standard reference - VALIDATE SITE/OEM | Duplicate source ID normalized in the current library; engineering review whether merge is preferable. | Use the Standard Task ID; review whether duplicate source tasks should remain separate. |