Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
220-P-037/00
5 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H260901344 | FITTING | ELBOW WELD 90~LR BW/ANSI B16.9 8IN-SCH 20 | 7 | PCS | 1 | R |
| H340902115 | FLANGE | FLANGE ANSI-CL300 RF-SERRATED-F WN/ANSI 8IN-SCH 20 | 2 | PCS | 1 | R |
| J200923083 | PIPE / TUBE | PIPE,LINE TP.S SMLS BE/ANSI B16.25/ANSI 8IN-SCH 20 | 838 | M | 1 | R |
| J200923086 | PIPE / TUBE | PIPE,LINE,SMLS,PE PER ANSI B36 3/4IN-SCH 80 | 1 | PCS | 1 | R |
| J200923137 | GASKET | GASKET SPIRAL-WOUND ANSI-CL300/ANSI B16. | 4 | PCS | 1 | R |