Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
P-2B-CPI/00
1 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| G285901366 | ELECTRICAL MRO | FUSE,CONTROL 6A E27,MANUFACTURE IEC LINK,OPERATION GL,TIME LAG | 2 | PCS | 2 | R |