Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
1-ACW128-3-2-A4/00
1 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H560500079 | PIPE / TUBE | PIPE,1,5 IN,THD,CS GALV, SCH 160, A53 SMLS | 2 | JT | 2 | R |