Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
202-SPW07-2-B6A/00
2 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| I090902310 | BOLT / STUD / NUT | BOLT,STUD,A193-B7,5/8",UNC-2A,100MM PV-0801801,PN107 | 8 | PCS | 2 | R |
| J200750802 | GASKET | GASKET SPRW 150# RF 4.5MM THICK 2IN | 6 | PCS | 2 | R |