Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU VI Balongan · 6601
11-P-121B/00
2 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H520904267 | BOLT / STUD / NUT | NUT,SS400,IT 758 DWG.NO.N9160C | 1 | PCS | 1 | R |
| H520906542 | BOLT / STUD / NUT | NUT,VALVE STEM,S20C,IT 735 DWG.NO.N9160C | 1 | PCS | 1 | R |