Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU VI Balongan · 6601
16-PSV-004B/00
6 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| B220900438 | PIPE / TUBE | PIPE/TUBING,SST-304 SO.19744-KMI-08-39-1-LN | 1 | PCS | 1 | - |
| H780908739 | FITTING | PIPE/CPI TUBE FITTING,STL SO.19744-KMI-08-39-1-LN | 1 | PCS | 1 | - |
| I090750110 | BOLT / STUD / NUT | BOLT,STUD,A193,B7,7/8INX4.3/4IN,2NUT DWG.1005519,REV.2,IT.C2 | 2 | PCS | 2 | - |
| I090750116 | BOLT / STUD / NUT | BOLT,STUD,A193,B7,7/8IN,5.1/2IN,2N SO.19744-KMI-08-39-1-LN | 1 | PCS | 1 | - |
| J200750086 | GASKET | GASKET,SW,SS304,N-ASB,10IN,150LB SO.19744-KMI-08-39-1-LN | 1 | PCS | 1 | - |
| J200750591 | GASKET | GASKET,SW,SS304,N-ASB,8IN,300LB SO.19744-KMI-08-39-1-LN | 1 | PCS | 1 | - |