Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU VI Balongan · 6601
25-E-103/00
2 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H160903156 | FITTING | PLUG,COUPLING,A105,N,NPT B2:1,600LB,D?IN DWG.NO.3941 | 7 | PCS | 1 | - |
| I090912011 | BOLT / STUD / NUT | BOLT, STUD, NUT, A193.B7, UNC, 3/4INX120 C/W,NUT STD A194 GR.2H | 1 | PCS | 1 | O |