Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU VI Balongan · 6601
10FG8302A1A110/00
3 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H260100202 | FITTING | ELBOW,90DEG,SR,ASTM A234,BW,SCH 40,10IN | 2 | PCS | 2 | O |
| H560500251 | PIPE / TUBE | PIPE ,10IN,SRL,BE,SMLS,SCH.40,CS A.53,GR.B, | 2 | JT | 2 | O |
| J200750195 | GASKET | GASKET,10",SW,W:SS304,OR,SS316,CL150,RF W:SS304 OR SS316,CL150,RF 4.5MM | 1 | PCS | 1 | O |