Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU VI Balongan · 6601
20-P-103A-P1A/00
5 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| C668900879 | LUBRICANT | LUBE OIL PUMP,ASSY,MDL.F40S-102 MFR SHIMADZU CORPORATION | 1 | SET | 1 | R |
| I090905728 | BOLT / STUD / NUT | BOLT,PN5 DWG.NO.433-93652 | 4 | PCS | 1 | C |
| I090910127 | BOLT / STUD / NUT | BOLT,PN17 DWG.NO.433-93652 | 4 | PCS | 1 | C |
| I820903644 | WASHER / SCREW | WASHER,PN7 DWG.NO.433-93652 | 8 | PCS | 1 | R |
| J355907084 | O-RING / ELASTOMER | O-RING,PN4 DWG.NO.433-93652 | 2 | PCS | 1 | R |