Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU VI Balongan · 6601
42-PL-1718-24/00
5 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H260100261 | FITTING | ELBOW,90,A234WPB,WELD,BW,24INX9.5THK SPLM-D-42-1369003R02D,REV,02,ST.3,IT.03 | 1 | PCS | 1 | - |
| H340801037 | FLANGE | FLANGE,24",A105,CL300,RF,SERF,WN,9.5MM,T | 1 | PCS | 1 | - |
| H560500905 | PIPE / TUBE | PIPE,A53B,SAW,S.10,B36.10M,24INX0.5M SPLM-D-42-1368003R026D,REV,02,IT.01 | 1 | JT | 1 | - |
| I090902516 | BOLT / STUD / NUT | BOLT,STUD,A193-B7,1-1/2INX9IN,2NUT SPLM-D-42-1368003R026D,REV,02,IT.04 | 48 | PCS | 1 | - |
| J200751765 | GASKET | GASKET,SW,GRA,SS316,24IN300X4.5TK,OR:CS SPLM-D-42-1369003R02D,REV,02,ST.2,IT.019 | 2 | PCS | 1 | - |