Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU VI Balongan · 6601
16-V-108/00
5 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| J200751968 | GASKET | GASKET,SW SS304 OR:CS ASB.150LB.1IN DOC.NO.116H-043-04 | 2 | PCS | 1 | - |
| J200751973 | GASKET | GASKET,SW SS304 OR:CS ASB.150LB.2IN DWG.NO.9111-5941 | 12 | PCS | 1 | - |
| J200751974 | GASKET | GASKET,SW SS304 ASB.OR:CS.150LB.24IN DWG.NO.V-2151-302F-A-103 | 2 | PCS | 1 | - |
| J200751976 | GASKET | GASKET,SW SS304 OR:CS ASB.150LB.3/4IN DWG.NO.30V-9370B | 4 | PCS | 1 | - |
| J200751979 | GASKET | GASKET FLANGE ASB 6IN 150LB FF T90-1060BD-1 IT.N-5-REV.2 | 2 | PCS | 1 | - |