Portal›BOM & Materials›Equipment BOM Binding›11-E-129B/00

Equipment BOM Binding

Actual normalized general-material relationships from SAP BOM source.

RU VI Balongan · 6601

11-E-129B/00

6 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.

ASSET REGISTER MATCH
SAP MaterialCommodityDescriptionQtyUOMBOM LinesSpare Flag
I090750323BOLT / STUD / NUTBOLT,STUD,A193,B7,1.1/8IN,390L,2NUT DWG.21BMJ-028-02-C,IT.40.0260PCS1R
I090753353BOLT / STUD / NUTBOLT,STUD,A193,B7,3/4IN,215L,2NUT DWG.21BMJ-028-02-C,IT.40.0048SET1R
I090753713BOLT / STUD / NUTBOLT,STUD,A193,B7,1IN,420L,2NUT DWG.21BMJ-028-02-C,IT.40.0160PCS1R
I090754890BOLT / STUD / NUTBOLT,STUD,A193,B7,7/8IN,465L,2NUT DWG.21BMJ-028-02-B,IT.40.0048PCS1R
J200750969GASKETGASKET,SPW,304,ASB,8IN,300,ORCS DWG.21BMJ-028-02-C,IT.49.031PCS1R
J200752278GASKETGASKET,SPW,304,ASB,12IN,300,ORCS DWG.21BMJ-028-02-C,IT.49.041PCS1R
A
Maintenance Strategy AssistantLevel 1 · Engineering Question Catalog · Offline · Evidence-grounded
Current context
Portal · BOM & Materials