Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU VII Kasim · 6701
6-1-P186-A1-NI/00
7 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H160903253 | FITTING | COUPLING,FULL,STL,A105,3/4",3000LB | 1 | PCS | 1 | - |
| H340802205 | FLANGE | FLANGE:PIPE,WN,CS,A105,RF,150#,S40,6IN | 2 | PCS | 1 | - |
| H560500167 | PIPE / TUBE | PIPE,CS,A106,B,SML,PE,80,1IN,6M DWG.D-22-1353-003-D,REV.4 | 0.8 | JT | 1 | - |
| H560500245 | PIPE / TUBE | PIPE,SMLS,S40,A53-B,CEMENT LINED,6" | 14 | JT | 1 | - |
| H560902957 | PIPE / TUBE | PIPE,A106 GR.B,SMLS,PE,SCH.80,3/4 IN | 0.8 | JT | 1 | - |
| I090750497 | BOLT / STUD / NUT | STUD BOLT 3/4INX120L,A193 GR.B7,CAD PLT | 16 | PCS | 1 | - |
| J200752551 | GASKET | GASKET,SPIRAL WOUND,FLEXITALIC,4IN-150# | 2 | PCS | 1 | - |