Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU III Plaju · 6301
23-ZE-2592/00
6 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| I090401219 | BOLT / STUD / NUT | BOLT AND NUT,IT.NO.10,SS400,A283-C DWG.T-2102-0,IT.10,REV.3 | 112 | PCS | 1 | - |
| I090902220 | BOLT / STUD / NUT | BOLT,STUD,A193,B7,1/2INX2.1/2IN,2NUT DWG.D-5167-1,IT.K | 4 | PCS | 1 | - |
| I090902249 | BOLT / STUD / NUT | GASKET,SW,SS304,GRA,4IN,150LB,OR:CS DWG.D-22-1353-003-D,IT.C,REV.4 | 8 | PCS | 2 | - |
| J200750136 | GASKET | GASKET,SW,GRP,IR304,ORCS,T4.5,11/2IN 150 DWG.V-215A-005-AJ-210-REV.6,IT.6 | 1 | PCS | 1 | - |
| J200751208 | GASKET | GASKET,SW,SS304,GRA,3/4IN,150LB,OR:CS DWG.GC-HE-19778,IT.N-5,REV.4 | 1 | PCS | 1 | - |
| J200751209 | GASKET | GASKET,SW,SS304,GRA,1IN,150LB,OR:CS DWG.D-22-1353-003-D,IT.C,REV.4 | 2 | PCS | 2 | - |