Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU III Plaju · 6301
MCC-FC-PM-4B/00
4 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| G205900415 | ELECTRICAL MRO | FUSE,LINK,HRC,3NA1328-2,300A | 3 | PCS | 1 | - |
| G205900669 | ELECTRICAL MRO | CONTACTOR,MAGNETIC,COIL,220A,50HZ,SC-10N | 1 | PCS | 1 | - |
| G285901551 | ELECTRICAL MRO | FUSE,CONTROL,AFAC-10,10A AFAC-10 | 1 | PCS | 1 | - |
| G285901709 | ELECTRICAL MRO | FUSE,ISOLATOR,3KL4130-1ABO,400A | 1 | PCS | 1 | - |