Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU III Plaju · 6301
22-V-202/00
5 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H160350466 | FITTING | COUPLING,A105,1/2IN,3000LB,NPT DOC.S-22-1355-001,IT.A | 1 | PCS | 1 | - |
| I090912394 | BOLT / STUD / NUT | BOLT,STUD,A193,B7,5/8INX3.1/4IN,2NUT DWG.T90-1060BB-1,Rev.2,IT.N-6 | 4 | SET | 1 | - |
| I090912403 | BOLT / STUD / NUT | BOLT,STUD,A193,B7,1.1/8INX6.1/4IN,2NUT DWG.T82-8566B-1,IT.EV,REV.2 | 20 | SET | 1 | - |
| J200750650 | GASKET | GASKET,SW,304,GRA,20IN,150,OR:CS DWG.D-21-1351-103,REV.1 | 1 | PCS | 1 | - |
| J200752734 | GASKET | GASKET,SW,SS304,GRA,2IN,150LB,OR:SS304 DWG.4303008-042,IT.N1,REV.2 | 1 | PCS | 1 | - |