Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU III Plaju · 6301
22-E-306B/00
3 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| I090401061 | BOLT / STUD / NUT | STUD BOLT A193-B7 W/A194-2H,3/4"X3.3/4" NPS:6" ASA 150LB | 16 | PCS | 4 | - |
| J200750136 | GASKET | GASKET,SW,GRP,IR304,ORCS,T4.5,11/2IN 150 DWG.V-215A-005-AJ-210-REV.6,IT.6 | 4 | PCS | 4 | - |
| J200750145 | GASKET | GASKET,SW,SS,304,GRAF,OR,CS,300LB,11/2IN DWG. NO. 9111-5629 | 4 | PCS | 4 | - |