Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU III Plaju · 6301
CM-FC-PM-3B/00
4 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| G205900655 | ELECTRICAL MRO | CONTACTOR,MAGNETIC,180A-220V-SC-8N | 1 | PCS | 1 | O |
| G285901548 | ELECTRICAL MRO | FUSE,CONTROL,10A,AFAC-10 | 1 | PCS | 1 | O |
| G285902213 | ELECTRICAL MRO | FUSED ISOLATOR 200A 3KL2130-1EBO | 1 | PCS | 1 | M |
| G285902228 | ELECTRICAL MRO | HRC FUSE LINKS 200A 3NA1225-1 | 3 | PCS | 1 | O |