Actual normalized general-material relationships from SAP BOM source.

RU IV Cilacap · 6401

LN53-2LA/00

7 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.

ASSET REGISTER MATCH
SAP MaterialCommodityDescriptionQtyUOMBOM LinesSpare Flag
H340902748FLANGEFLANGE,SO,SCH40,A105,150#RF,20"1PCS1E
H560500529PIPE / TUBEPIPE,SMLS,S80,A53-B,20"1JT1-
H560500583PIPE / TUBEPIPE,ERW,SCH10,API-5L-B,CEMENT,LND,30"1JT1-
H560500764PIPE / TUBEPIPE,SMLS,STD,A53-B,CEMENT LINED,20"1JT1-
I090401076BOLT / STUD / NUTSTUD BOLT A193-B7 W/A194-2H,1.3/4 X 11.1 NPS:30" ASA 300LB28PCS1R
J200926943GASKETGASKET,150#,ASB RING 1/16"THK,20"1PCS1E
J200927233GASKETGASKET,300#,ASB RING 1/16"THK,20"1PCS1E