Portal›BOM & Materials›Equipment BOM Binding›4-FW-21120-MS1A/00

Equipment BOM Binding

Actual normalized general-material relationships from SAP BOM source.

RU II Dumai · 6201

4-FW-21120-MS1A/00

10 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.

ASSET REGISTER MATCH
SAP MaterialCommodityDescriptionQtyUOMBOM LinesSpare Flag
743085051900PIPE / TUBEPIPE,MTL,160,1-1/2IN,A532JT1-
743085078900PIPE / TUBEPIPE,MTL,40,4IN,A532JT1-
743085080900PIPE / TUBEPIPE,MTL,40,3IN,A532JT1-
762470532900FITTINGTEE,BW,EQ Y,6.02MM,4IN,A234-WPB1PCS1-
762938021900FITTINGELBOW,BW,1-1/2IN,90,160,A234-WPB,LR12PCS1-
763040005900FITTINGELBOW,BW,EQ,90DEG,40,4IN,A234-WPB8PCS1-
766163505900FLANGEFLANGE,WLD NECK,150,40,14IN,A105,RF10PCS1-
813861756900BOLT / STUD / NUTSTUDBOLT,WITH NUT,A193-B7,6-1/4,3/42PCS1-
854133463900GASKETGASKET,SPW,150,GPH,4IN,CG,A240-TP30410PCS1-
H630500221PIPE / TUBESOCKOLET,CS,A105(PIPE,2-52IN),80,1-1/2IN12PCS1-