Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU IV Cilacap · 6401
025PSV001/00
5 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| I090911575 | BOLT / STUD / NUT | STUD BOLT,A193-B7,W/A194-2H,3/4"X4" | 8 | PCS | 1 | O |
| I090911924 | BOLT / STUD / NUT | BOLT,STUD, 3/4IN LG 4 1/4IN,B7/2H,W/2 NU | 12 | PCS | 1 | O |
| J200750194 | GASKET | GASKET,8",SW,W:SS304,OR,SS316,CL150,RF W:SS304 OR SS316,CL150,RF 4.5MM | 1 | PCS | 1 | R |
| J200750216 | GASKET | GASKET,SW,OR:CS,SS304,ASB,300LB,6IN DWG.10/M/MAINT/03/2019/1-3 | 1 | PCS | 1 | R |
| J200909497 | GASKET | GASKET, 6Q8 JO S-25-C | 1 | SET | 1 | R |