Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU IV Cilacap · 6401
89E207B/00
8 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H560902529 | PIPE / TUBE | PIPE, 6".SCH.80-XS-243 DWG:SG-03268/1-33 | 1 | PCS | 1 | M |
| H780904691 | PIPE / TUBE | TUBE, 1"X9144-BWG.11.MW DWG:SG-03268/1-31 | 420 | PCS | 1 | C |
| I090902294 | BOLT / STUD / NUT | BOLT,STUD,A193,B7,3/4IN,3.3/4IN,2NUT T90-1060BD-1 IT.N-5-REV.2 | 8 | PCS | 1 | O |
| I090902350 | BOLT / STUD / NUT | STUD,THREAD,NUT 2H,7/8X4.1/2,A193,B7 DWG.A2-2202-225-4,IT.A,D | 24 | PCS | 1 | O |
| J200751581 | GASKET | GASKET,SPW,316L,GRAP,10IN,150,OR,CS DWG.82-3058-2 | 2 | PCS | 1 | R |
| J200751862 | GASKET | GASKET,SW,A304SS,ASB,ORCS,CL 150,6 IN DWG.NO.9111-5797 | 1 | PCS | 1 | R |
| J200926065 | GASKET | GASKET FOR 27, DWG-SG-44532/4 POS.01-11 DWG:SG-03268/1-43 | 420 | PCS | 1 | R |
| J200926068 | GASKET | GASKET FOR 28, DWG.SG-44532/4 POS.03-11 SG-03264/1-44 | 420 | PCS | 1 | R |