Portal›BOM & Materials›Equipment BOM Binding›3SUL21112A1A2/00

Equipment BOM Binding

Actual normalized general-material relationships from SAP BOM source.

RU II Dumai · 6201

3SUL21112A1A2/00

9 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.

ASSET REGISTER MATCH
SAP MaterialCommodityDescriptionQtyUOMBOM LinesSpare Flag
743085050900PIPE / TUBEPIPE,MTL,80,1-1/2IN,A531JT1-
743085080900PIPE / TUBEPIPE,MTL,40,3IN,A531JT1-
762470533900FITTINGTEE,BW,EQ Y,5.49X5.49X5.49MM,3IN1PCS1-
763038045900FITTINGELBOW,BW,EQ,45DEG,80,1-1/2IN,A234-WPB2PCS1-
763040004900FITTINGELBOW,BW,EQ,90DEG,40,3IN,A234-WPB3PCS1-
766163173900FLANGEFLANGE,WLD NECK,150,40,3IN,A105,RF5PCS1-
854141719900GASKETGASKET,SPW,150,GPH,3IN,CG,A240-TP3045PCS1-
E060905602FITTINGELBOW,11/2"90 DEG,3000#,FS SW,A105 DWG.84726500863PCS1-
H630500023PIPE / TUBESOCKOLET:PIPE,CS,A234WPB,3000#,20X1-1/2"1PCS1-
A
Maintenance Strategy AssistantLevel 1 · Engineering Question Catalog · Offline · Evidence-grounded
Current context
Portal · BOM & Materials