Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
202-LLS19-10-B2/00
2 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| I090400697 | BOLT / STUD / NUT | BOLT,MACHINE,Ø 3/4"LG 110MM,B7/2H,W/NUT DWG.AO-2194-2-5 | 8 | PCS | 1 | R |
| J200750833 | GASKET | GASKET,SW,304,GRA,4IN,300,OR:CS DWG.842-22-01,REV.2 | 1 | PCS | 1 | R |