Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
201-FLO23-1-B20/00
3 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H260100364 | FITTING | ELBOW,90DEG,CS,SW,SML,A105,3000 LB,1 IN | 3 | PCS | 1 | R |
| H340902059 | FLANGE | FLANGE,SS,A182 F316,RF,SW,150#,1IN-SCH80 DR-201-1362-007-110-D | 1 | PCS | 1 | R |
| H340902706 | FLANGE | FLANGE,SW,RF,1IN,150LB,CS,A.105 ,SCH.160,ANSI B16.5 | 1 | PCS | 1 | R |