Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
201-PT-118/00
1 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| E650900256 | INSTRUMENT MRO | ELECTRONIC PRESSURE TRANSMITTER | 1 | UNT | 1 | R |