Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
EA-3-02-BS/00
4 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| C077500476 | PIPE / TUBE | BUNDLE TUBE,TUBE DIA 1"X12BWG.MW | 44 | PCS | 1 | R |
| J200650041 | GASKET | GASKET,RJT,OCTL,SOFT IRON,6IN,1500 LB DIM&MARK ANSI B16.20,SIZE 6IN | 4 | PCS | 1 | O |
| J200650263 | GASKET | GASKET, SW, 18CR.10NI.2MO, 1500, 1 IN GASKET, TYPE SW, MAT 18CR.10NI.2MO | 2 | PCS | 1 | O |
| J200750409 | GASKET | GASKET,SPW, ASB FILLED,CS,300,1 IN T:3/16IN,PURP FLG ANSI B16.5,A240-316L | 2 | PCS | 1 | O |