Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
EA-3-21A/00
5 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| I090400095 | BOLT / STUD / NUT | BOLT&NUT, CS, GALV, SIZE 5/8 IN, LENGTH MFR PROCESS GALVANIZ,MDL BS970 STEEL | 10 | PCS | 1 | O |
| I090400696 | BOLT / STUD / NUT | BOLT&NUT, MACH, 1/2INX30MM MFR PROCESS GALVANIZED,MDL WASHER,A307-B | 30 | PCS | 1 | O |
| I750200738 | BOLT / STUD / NUT | BOLT,2N,3/4IN-UNCX4.1/2IN,A193B7,A194 C/W STUD AS A193,NUT MAT STD A194 | 8 | PCS | 1 | O |
| J200910501 | GASKET | GASKET,SI,29X35X0,8 MM,A.316-V560 GASKET,S/N SB-152.122,EQU EA-1-29 | 180 | PCS | 1 | R |
| J200917949 | GASKET | GASKET,RUBBER,4IN - 300LB,5MM DWG.211-2128/2,IT.45 | 4 | PCS | 1 | R |