Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
SS80-LSW-01A/00
7 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| C437500080 | ELECTRICAL MRO | SPACE HEATER, AC 220V 50HZ 200W SHC-2220 | 2 | PCS | 2 | R |
| G085500779 | ELECTRICAL MRO | AIR CIRCUIT BREAKER, AC 380V 50HZ 3200AF | 1 | PCS | 1 | R |
| G285901215 | ELECTRICAL MRO | FUSE,BASE,S-N1301,250V,1A | 3 | PCS | 1 | R |
| G285901318 | ELECTRICAL MRO | FUSE, 3A AFAC-30 | 3 | PCS | 1 | R |
| G285901396 | ELECTRICAL MRO | FUSE, 600V 30AF F-10A AFAC-30 | 38 | PCS | 1 | R |
| G725200205 | ELECTRICAL MRO | CURRENT TRANSFORMER TERMINAL, 4P 5A HR5-C4 | 1 | PCS | 1 | R |
| G725900719 | ELECTRICAL MRO | POTENTIAL TRANSFORMER TERMINAL, 4P 5A HR5-P4 | 1 | PCS | 1 | R |