Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
2-LLS10-1-B2/00
1 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H560501050 | PIPE / TUBE | PIPE,6IN,SRL,BE,SMLS,SCH STD,CS API 5L,GR.B | 12 | FT | 1 | R |