Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU V Balikpapan · 6501
2-FO06-2-C3/00
1 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H560500082 | PIPE / TUBE | PIPE, LINE, SML, CS, 5L GR.B,2IN,SCH.80 | 50 | JT | 1 | R |