SAP Material
H560901280
PIPE 219 OD X 8.2MW X 2268 0231-84-2356-12B REV 4
BOM Relationships
3
Bound Equipment
3
Plant Codes
1
Attribute Completeness
25%
Normalized Candidate
PIPE / TUBE
General MRO / project material
Type: Pipe
Not generated — insufficient controlled attributes
Plant Usage
RU V Balikpapan · 6501
3
Actual Equipment Bindings
3 aggregated equipment-material bindings; first 3 displayed.
| Plant / RU | Equipment | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|
| RU V Balikpapan · 6501 | F-5-01B/00 | 1 | PCS | 1 | R |
| RU V Balikpapan · 6501 | F-5-01A/00 | 1 | PCS | 1 | R |
| RU V Balikpapan · 6501 | F-5-01C/00 | 1 | PCS | 1 | R |
Interchangeability is not implied. Reuse across many equipment tags is factual SAP BOM evidence only. Engineering equivalence requires specification and service verification.