SAP Material
H560901943
PIPE,BEARING HOUSING,A216-VCB,PN 468 DWG.NO.91Y2783
BOM Relationships
5
Bound Equipment
5
Plant Codes
1
Attribute Completeness
25%
Normalized Candidate
PIPE / TUBE
General MRO / project material
Type: Pipe
Not generated — insufficient controlled attributes
Plant Usage
RU VI Balongan · 6601
5
Actual Equipment Bindings
5 aggregated equipment-material bindings; first 5 displayed.
| Plant / RU | Equipment | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|
| RU VI Balongan · 6601 | 23-P-104/00 | 1 | PCS | 1 | R |
| RU VI Balongan · 6601 | 10-P-902B/00 | 2 | PCS | 1 | C |
| RU VI Balongan · 6601 | 10-P-901A/00 | 3 | PCS | 1 | C |
| RU VI Balongan · 6601 | 10-P-901B/00 | 3 | PCS | 1 | C |
| RU VI Balongan · 6601 | 10-P-902A/00 | 2 | PCS | 1 | C |
Interchangeability is not implied. Reuse across many equipment tags is factual SAP BOM evidence only. Engineering equivalence requires specification and service verification.