SAP Material
H560902648
COLUMN PIPE DWG:EBP-2025-103,REV-2,IT.173-1
BOM Relationships
6
Bound Equipment
6
Plant Codes
1
Attribute Completeness
25%
Normalized Candidate
PIPE / TUBE
General MRO / project material
Type: Pipe
Not generated — insufficient controlled attributes
Plant Usage
RU V Balikpapan · 6501
6
Actual Equipment Bindings
6 aggregated equipment-material bindings; first 6 displayed.
| Plant / RU | Equipment | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|
| RU V Balikpapan · 6501 | G-20-25A/00 | 1 | PCS | 1 | O |
| RU V Balikpapan · 6501 | G-20-06C/00 | 1 | PCS | 1 | E |
| RU V Balikpapan · 6501 | G-20-21/00 | 1 | PCS | 1 | O |
| RU V Balikpapan · 6501 | G-20-06A/00 | 1 | PCS | 1 | E |
| RU V Balikpapan · 6501 | G-20-06B/00 | 1 | PCS | 1 | E |
| RU V Balikpapan · 6501 | G-20-25B/00 | 1 | PCS | 1 | O |
Interchangeability is not implied. Reuse across many equipment tags is factual SAP BOM evidence only. Engineering equivalence requires specification and service verification.