SAP Material
H560902807
PIPE/7B SCH 40-90.6,SIS 370 DWG.1C-231-020-181,REV.1,PN.5
BOM Relationships
1
Bound Equipment
1
Plant Codes
1
Attribute Completeness
50%
Normalized Candidate
PIPE / TUBE
General MRO / project material
Schedule: 40 · Type: Pipe
Not generated — insufficient controlled attributes
Plant Usage
RU III Plaju · 6301
1
Actual Equipment Bindings
1 aggregated equipment-material bindings; first 1 displayed.
| Plant / RU | Equipment | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|
| RU III Plaju · 6301 | 23-D-2218/00 | 1 | PCS | 1 | - |
Interchangeability is not implied. Reuse across many equipment tags is factual SAP BOM evidence only. Engineering equivalence requires specification and service verification.