SAP Material
C143900024
COLUMN PIPE DWG:DF.004245 REV.1,IT.4131
BOM Relationships
4
Bound Equipment
3
Plant Codes
2
Attribute Completeness
25%
Normalized Candidate
PIPE / TUBE
General MRO / project material
Type: Pipe
Not generated — insufficient controlled attributes
Plant Usage
RU V Balikpapan · 6501
2
RU VI Balongan · 6601
1
Actual Equipment Bindings
3 aggregated equipment-material bindings; first 3 displayed.
| Plant / RU | Equipment | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|
| RU V Balikpapan · 6501 | G-234-02B/00 | 16 | M | 1 | O |
| RU V Balikpapan · 6501 | G-234-02A/00 | 16 | M | 1 | O |
| RU VI Balongan · 6601 | 12-P-902/00 | 4 | M | 2 | C |
Interchangeability is not implied. Reuse across many equipment tags is factual SAP BOM evidence only. Engineering equivalence requires specification and service verification.