SAP Material
H560905539
PIPE,PC#89158B DWG.88057C,IT.002
BOM Relationships
2
Bound Equipment
2
Plant Codes
1
Attribute Completeness
25%
Normalized Candidate
PIPE / TUBE
General MRO / project material
Type: Pipe
Not generated — insufficient controlled attributes
Plant Usage
RU V Balikpapan · 6501
2
Actual Equipment Bindings
2 aggregated equipment-material bindings; first 2 displayed.
| Plant / RU | Equipment | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|
| RU V Balikpapan · 6501 | GT-8-22C/00 | 1 | PCS | 1 | - |
| RU V Balikpapan · 6501 | GT-8-22A/00 | 1 | PCS | 1 | - |
Interchangeability is not implied. Reuse across many equipment tags is factual SAP BOM evidence only. Engineering equivalence requires specification and service verification.