SAP Material
H800900056
TUBING R120AA
BOM Relationships
5
Bound Equipment
5
Plant Codes
1
Attribute Completeness
25%
Normalized Candidate
PIPE / TUBE
General MRO / project material
Type: Tubing
Not generated — insufficient controlled attributes
Plant Usage
RU V Balikpapan · 6501
5
Actual Equipment Bindings
5 aggregated equipment-material bindings; first 5 displayed.
| Plant / RU | Equipment | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|
| RU V Balikpapan · 6501 | GCP-RPI-101-2/00 | 1 | PCS | 1 | R |
| RU V Balikpapan · 6501 | GCP-PIC-101/00 | 1 | PCS | 1 | R |
| RU V Balikpapan · 6501 | GCP-RPI-101-1/00 | 1 | PCS | 1 | R |
| RU V Balikpapan · 6501 | GCP-RPI-101-3/00 | 1 | PCS | 1 | R |
| RU V Balikpapan · 6501 | B3-TIC-302/00 | 1 | PCS | 1 | R |
Interchangeability is not implied. Reuse across many equipment tags is factual SAP BOM evidence only. Engineering equivalence requires specification and service verification.