SAP Material
I620900766
SHEET,TUBE,INTERMEDIATE CONVECTION SHEET,TUBE,INTERMEDIATE CONVECTION
BOM Relationships
4
Bound Equipment
3
Plant Codes
1
Attribute Completeness
25%
Normalized Candidate
PIPE / TUBE
General MRO / project material
Type: Tube
Not generated — insufficient controlled attributes
Plant Usage
RU V Balikpapan · 6501
3
Actual Equipment Bindings
3 aggregated equipment-material bindings; first 3 displayed.
| Plant / RU | Equipment | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|
| RU V Balikpapan · 6501 | F-3-01B/00 | 5 | PCS | 1 | R |
| RU V Balikpapan · 6501 | F-3-01A/00 | 5 | PCS | 1 | - |
| RU V Balikpapan · 6501 | F-201-01/00 | 2 | PCS | 2 | O |
Interchangeability is not implied. Reuse across many equipment tags is factual SAP BOM evidence only. Engineering equivalence requires specification and service verification.