Portal›Maintenance Plan
Maintenance Plan Engineering
Converts approved task logic into scheduling / trigger rules and lean SAP execution. Not every maintenance activity requires a cyclic work order.
Registered Plans - Assets
36.036
16.0% coverage
Plan Engineering Rows
314
One per maintenance task
SAP Plan Patterns
8
PA-01 through PA-08 plan patterns
Actual Call-Detail Assets
19.574
Matched from RU Sheet2
SAP Plan Patterns
| Code | Plan Pattern | Use Case | Call Object | Routine Plan? | Default Grouping | Task Rows |
|---|---|---|---|---|---|---|
| PA-01 | Monitoring / No Routine SAP Plan | Continuous/online monitoring; exception-driven action | None | No | System/area monitoring route | 37 |
| PA-02 | Inspection / Routine Notification | Simple inspection / due-date / condition route | Notification | Yes | Route/circuit/area/due window | 120 |
| PA-03 | Test / Calibration Notification | Simple test/calibration/proving | Notification | Yes | Unit + discipline + method + due window | 12 |
| PA-04 | Campaign / Package WO | Repetitive work needing resources / permit / vendor | Package WO | Yes | Area/unit + discipline/vendor + common window | 76 |
| PA-05 | Individual Planned WO | Unique asset-specific scheduled work | Individual WO | Yes | Equipment-specific | 0 |
| PA-06 | TA / Shutdown Package | Intrusive work requiring outage/TA | Package WO | Conditional | TA/unit/system/work package | 14 |
| PA-07 | Condition-Triggered WO | Repair/restoration from finding/diagnostic | Individual WO | No routine cyclic plan | Finding/equipment/defect | 54 |
| PA-08 | RTF / Corrective | Approved failure-event workflow | Corrective Notification / WO | No preventive plan | Equipment/failure event | 1 |
Maintenance Plan Engineering Library - Task ID deep-links back to the Task List.314 rows
| Task ID | Family | Task Title | Final Frequency / Trigger Rule | Owner | Plan Pattern | SAP Plan Type | Call Object | Routine? |
|---|---|---|---|---|---|---|---|---|
| CV-MARINE-CERT-01 | Jetty / Marine / Barge / Mooring | Marine / Jetty Statutory Inspection / Certification | Per legal / certification due date. No extension without authorized basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| UT-HVAC-CERT-01 | HVAC / Refrigeration / Chiller | HVAC / Refrigeration Statutory Inspection / Certification | Per legal / certification due date. No extension without authorized basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| SF-FIRE-FT-02 | Fire Fighting / Fire Water / Foam Equipment | Fire Pump / Deluge / Monitor Performance Test | Per approved fire-protection ITM / Performance Standard programme. | Reliability + Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| ST-TANK-CRYO-CERT-02 | Cryogenic / Refrigerated Storage Tank | Cryogenic / Refrigerated Storage Tank Statutory / Authorized Inspection | Per legal / certification due date. No extension without authorized basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-SPHERE-CERT-01 | Pressure Sphere | Pressure Sphere Statutory / Authorized Inspection | Per legal / certification due date. No extension without authorized basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-BOILER-CERT-01 | Boiler | Boiler Statutory / Authorized Inspection | Per legal / certification due date. No extension without authorized basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-HEATER-CERT-01 | Fired Heater / Furnace | Fired Heater / Furnace Statutory / Authorized Inspection | Per legal / certification due date. No extension without authorized basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-VESSEL-NP-INS-01 | Non-Pressure Process Vessel | Non-Pressure Process Vessel Routine Condition Inspection | Periodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-VESSEL-NP-PM-01 | Non-Pressure Process Vessel | Non-Pressure Process Vessel Preventive Service | Per OEM / usage / condition. Do not substitute an arbitrary calendar cycle. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| ST-VESSEL-NP-CM-01 | Non-Pressure Process Vessel | Non-Pressure Process Vessel Condition / Performance Monitoring | Continuous monitoring + approved route verification. | Reliability / Condition Monitoring | PA-01 MONITORING / NO ROUTINE SAP PLAN | No routine SAP plan | None | No |
| ST-VESSEL-NP-FT-01 | Non-Pressure Process Vessel | Non-Pressure Process Vessel Functional / Performance Test | At approved test due date or earlier on adverse condition. | Reliability + Discipline | PA-03 TEST / CALIBRATION NOTIFICATION | Single-cycle / strategy notification plan | Notification | Yes |
| ST-VESSEL-NP-OVH-01 | Non-Pressure Process Vessel | Non-Pressure Process Vessel Condition-Triggered Repair / Restoration | Condition/finding triggered; no routine calendar cycle. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| ZZ-RECLASSIFY-DATA-01 | Unclassified Asset | RECLASSIFY ASSET BEFORE TASKLIST ASSIGNMENT | No routine plan; event/failure driven. | Inspection / Asset Integrity | PA-01 MONITORING / NO ROUTINE SAP PLAN | No routine SAP plan | None | No |
| GOV-RTF-01 | Run-to-Failure Governance | Run-to-Failure / Corrective-Only Governance | No routine plan; event/failure driven. | Reliability + Maintenance Discipline | PA-08 RTF / CORRECTIVE | No preventive plan | Corrective Notification / WO | No |