SECE Assurance & MAH Study Integration
Enterprise-level evidence, reconciliation and governance layer connecting the MAH SECE register to the Maintenance Strategy Portal without altering core maintenance logic.
Keep study evidence authoritative without turning it into an uncontrolled master-data overwrite
The MAH register is preserved as a separate evidence domain. Exact RU + tag matching creates traceable links to equipment; conflicts become governed reconciliation actions.
Study Coverage by RU
Reconciliation Logic
Exact RU + equipment tag match and current portal SECE marker is already present.
Action: Preserve existing core logic; evidence strengthens traceability.
Exact RU + equipment tag match but current portal SECE marker is not set.
Action: Do not auto-write. Raise controlled reconciliation/change request before core marker changes.
MAH study tag/entity has no exact RU + equipment match in the uploaded master.
Action: Classify as equipment, FLOC, line, system/facility barrier element, formatting issue, or genuine master-data gap.
Current portal SECE marker exists, but the equipment is absent from the currently uploaded MAH study register.
Action: Do not demote. Preserve marker until study scope and evidence are reconciled.
SECE Study Register · Unique Tags
Study records are searchable without forcing them into the equipment model.
| RU | Tag | Name (Study) | Node(s) | SECE Element(s) | Status | Linked |
|---|---|---|---|---|---|---|
| RU VII Kasim | 4-P-02A/00 | MAIN FIREWATER PUMP 4-P-02A | Node 1 (CDU), Node 5-10 (Utility) | Fire Water Pump, Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-P-02B/00 | MAIN FIREWATER PUMP 4-P-02B | Node 1 (CDU), Node 5-10 (Utility) | Fire Water Pump, Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-P-02C/00 | MAIN FIREWATER PUMP C JETTY II | Node 5-10 (Utility) | Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-P-03A/00 | JOCKEY PUMP 4-P-03A | Node 4 (OM) | Fire Water Pump | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-P-03C/00 | FIREWATER JOCKEY PUMP 4-P-03C | Node 4 (OM) | Fire Water Pump | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-PDE-2B/00 | MAIN FIREWATER TANK DIESEL ENGINE | Node 1 (CDU) | Fire Water Pump | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-PM-02A/00 | MAIN FIREWATER PUMP A MOTOR | Node 1 (CDU) | Fire Water Pump | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-PM-02B/00 | MAIN FIREWATER PUMP A MOTOR | Node 4 (OM) | Fire Water Pump | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-PM-03B/00 | FIREWATER JOCKEY PUMP MOTOR | Node 4 (OM) | Fire Water Pump | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 4-PSL-319/00 | PRESS SWITCH LOW | Node 5-10 (Utility) | Pressure Initiator | Study Entity · Not Linked to Equipment Master | - |
| RU VII Kasim | 4-PSL-333/00 | PRESS SWITCH LOW | Node 5-10 (Utility) | Pressure Initiator | Study Entity · Not Linked to Equipment Master | - |
| RU VI Balongan | 41-A-101/00 | SINGLE POINT MOORING 17.500 DWT-IM 1541 | Node 2 (SPM&SPL) | Mooring Equipment | MAH Confirmed · Existing Marker | Yes |
| RU VI Balongan | 41-A-102/00 | SINGLE POINT MOORING 35.000 DWT-SO 1152 | Node 2 (SPM&SPL) | Mooring Equipment | MAH Confirmed · Existing Marker | Yes |
| RU VI Balongan | 41-A-105/00 | Node 2 (SPM&SPL) | Mooring Equipment | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-ERC-AVTMLA-3 | Node 1 (Jetty) | Emergency Quick Release Devices | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-ERC-LPGMLA-1 | Node 1 (Jetty) | Emergency Quick Release Devices | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-ERC-PRPMLA-2 | Node 1 (Jetty) | Emergency Quick Release Devices | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-ERC-SPM-1 | Node 2 (SPM&SPL) | Emergency Quick Release Devices | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-ERC-SPM-2 | Node 2 (SPM&SPL) | Emergency Quick Release Devices | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-ERC-SPM-3 | Node 2 (SPM&SPL) | Emergency Quick Release Devices | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-GDF-AVTHS (Dummy) | Node 1 (Jetty) | Catalytic Point Gas Detector | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-GDF-AVTMLA (Dummy) | Node 1 (Jetty) | Catalytic Point Gas Detector | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-GDF-LPGMLA (Dummy) | Node 1 (Jetty) | Catalytic Point Gas Detector | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-GDF-PRPMLA (Dummy) | Node 1 (Jetty) | Catalytic Point Gas Detector | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-LA-101/00 | MARINE LOADING ARM -1 | Node 1 (Jetty) | Loading Arm Equipment | MAH Confirmed · Existing Marker | Yes |
| RU VI Balongan | 41-LA-102/00 | MARINE LOADING ARM -2 | Node 1 (Jetty) | Loading Arm Equipment | MAH Confirmed · Existing Marker | Yes |
| RU VI Balongan | 41-LA-103 | Node 1 (Jetty) | Loading Arm Equipment | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-LH-101 | Node 1 (Jetty) | Loading Hose Equipment | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PG-2201-A2A1-4" | Node 1 (Jetty) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PG-JT0206-A2A1-1" | Node 1 (Jetty) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PL-0301-HFW360I-20"Ø-PE-CWC | Node 2 (SPM&SPL) | Subsea Pipeline | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PL-0307-A1A1V-8" | Node 1 (Jetty) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PL-0308-A1A1V-8" | Node 1 (Jetty) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PL-0309-A1A1V-8" | Node 1 (Jetty) | Onshore Pipeline | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PL-0310-A1A1V-10" | Node 1 (Jetty) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PL-3W01-32/00 | PIPE LINE 41-PL-3W01-X65-32IN | Node 2 (SPM&SPL) | Subsea Pipeline | MAH Confirmed · Existing Marker | Yes |
| RU VI Balongan | 41-PL-3W02-32/00 | PIPE LINE 41-PL-3W01-X65-32IN | Node 2 (SPM&SPL) | Subsea Pipeline | MAH Confirmed · Existing Marker | Yes |
| RU VI Balongan | 41-PL-4101-A1A1V-10" | Node 1 (Jetty) | Onshore Pipeline | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PL-4102-A1A1V-10" | Node 1 (Jetty) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 41-PL-JT0203-A2A1-4" | Node 1 (Jetty) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - |
Study Node Coverage
| RU | Phase | Node | Study Tag Rows |
|---|---|---|---|
| RU III Plaju | Phase 1 | Node 1 (CD II) | 164 |
| RU III Plaju | Phase 1 | Node 2 (CD III) | 88 |
| RU III Plaju | Phase 1 | Node 3 (CD IV) | 104 |
| RU III Plaju | Phase 2 | Node 04 (CDU V) | 110 |
| RU III Plaju | Phase 2 | Node-05 (STAB C) | 82 |
| RU III Plaju | Phase 2 | Node-07 (Alkylation) | 102 |
| RU III Plaju | Phase 2 | Node-08 (C4 Poly) | 78 |
| RU VI Balongan | Phase 1 | Node 3 (Spherical Tank) | 673 |
| RU VI Balongan | Phase 1 | Node 5 (Intermediate Tank) | 305 |
| RU VI Balongan | Phase 1 | Node 8 (EWTP) | 24 |
| RU VI Balongan | Phase 2 | Node 1 (Jetty) | 61 |
| RU VI Balongan | Phase 2 | Node 2 (SPM&SPL) | 27 |
| RU VI Balongan | Phase 2 | Node 4 (Feed Tanks) | 555 |
| RU VI Balongan | Phase 2 | Node 6 (Product Tanks) | 404 |
| RU VII Kasim | Phase 1 | Node 1 (CDU) | 144 |
| RU VII Kasim | Phase 1 | Node 2 (NHTU) | 19 |
| RU VII Kasim | Phase 2 | Node 3 (CRU) | 42 |
| RU VII Kasim | Phase 2 | Node 4 (OM) | 303 |
| RU VII Kasim | Phase 2 | Node 5-10 (Utility) | 18 |
| TOTAL | 3303 | ||
| Tag Number unik (setelah dedup) | 3236 |
Entity-Resolution Concentration
SECE elements with the highest count of study entities not exact-linked to Equipment Master.
| RU | SECE Element | Study Unique | Linked | Unlinked |
|---|---|---|---|---|
| RU VI Balongan | Pipework (Within Plant) | 396 | 167 | 229 |
| RU VI Balongan | Fixed Fire Water Distribution | 189 | 58 | 131 |
| RU VI Balongan | Flame Detector and Alarm | 129 | 0 | 129 |
| RU VI Balongan | Emergency Alarms (Siren) | 91 | 0 | 91 |
| RU VII Kasim | Structural Support | 55 | 0 | 55 |
| RU VI Balongan | IR Open Path Gas Detector | 52 | 0 | 52 |
| RU VI Balongan | Electrical Motor Control | 64 | 17 | 47 |
| RU VI Balongan | Motor Operated Valve (MOV, EIV) | 211 | 177 | 34 |
| RU VI Balongan | Inert Function | 65 | 33 | 32 |
| RU VI Balongan | Catalytic Point Gas Detector | 83 | 55 | 28 |
| RU VI Balongan | Pressure Safety Valve | 57 | 30 | 27 |
| RU VI Balongan | Cathodic Protection | 19 | 0 | 19 |