SECE Assurance & MAH Study Integration
Enterprise-level evidence, reconciliation and governance layer connecting the MAH SECE register to the Maintenance Strategy Portal without altering core maintenance logic.
Keep study evidence authoritative without turning it into an uncontrolled master-data overwrite
The MAH register is preserved as a separate evidence domain. Exact RU + tag matching creates traceable links to equipment; conflicts become governed reconciliation actions.
Study Coverage by RU
Reconciliation Logic
Exact RU + equipment tag match and current portal SECE marker is already present.
Action: Preserve existing core logic; evidence strengthens traceability.
Exact RU + equipment tag match but current portal SECE marker is not set.
Action: Do not auto-write. Raise controlled reconciliation/change request before core marker changes.
MAH study tag/entity has no exact RU + equipment match in the uploaded master.
Action: Classify as equipment, FLOC, line, system/facility barrier element, formatting issue, or genuine master-data gap.
Current portal SECE marker exists, but the equipment is absent from the currently uploaded MAH study register.
Action: Do not demote. Preserve marker until study scope and evidence are reconciled.
SECE Study Register · Unique Tags
Study records are searchable without forcing them into the equipment model.
| RU | Tag | Name (Study) | Node(s) | SECE Element(s) | Status | Linked |
|---|---|---|---|---|---|---|
| RU VII Kasim | 1-XV-409B3/00 | SHUTOFF VALVE FUEL GAS TO HEATER 1-F-01 | Node 1 (CDU) | Shutdown Valve (XCV, SOV) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 1-XV-409B4/00 | SHUTOFF VALVE FUEL GAS TO HEATER 1-F-01 | Node 1 (CDU) | Shutdown Valve (XCV, SOV) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 1-XV-409C/00 | FUEL GAS VENT VALVE 1-XV-409C | Node 1 (CDU) | Shutdown Valve (XCV, SOV) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 10"-5-P433-A1-H-ET | SUCT 5-P-13A/B TO 5-P-15A/B | Node 4 (OM) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - |
| RU VII Kasim | 10"-5-P465-A1-NI | LINE NO. 5-P465 TO 5-P-14 A/B | Node 4 (OM) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - |
| RU VII Kasim | 10-4-FW390-A1F/00 | DICH 4-P-02/03 TO MAIN FIREWATER HDR | Node 5-10 (Utility) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 10-4-FW390-A1F/00 (SS) | Node 5-10 (Utility) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 10-5-P422-A1-NI/00 | OUTL METERING PETROGAS TO TANK 5-T-01/02 | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 10-5-P425-A1-NI/00 | DISCH 5-P-01A/B TO INLET TANK 5-T-01/02 | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 10-5-P452-A1-NI/00 | OUTL TANK 5-T-10/11/12 TO SUCT 5-P-19A/B | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 10-5-P458-A1-NI/00 | OUTLET 5-T-13/14/15 TO SUCTION 5-P-15A/B | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 10-5-P464-A1-NI/00 | OUTLET TANK 5-T-18 TO 5-P-14A/B | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 12-1-HC115-B2-H/00 | OUT FUR 1-F-01 TO FLASH ZONE 1-C-01 | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 12-1-HC115-B2-H/00 (SS) | Node 1 (CDU) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 12-5-P434-A1-H/00 | DISCH 5-P-13A/B TO METER RESIDUE SKID | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 12-5-PF411-A1/00 | OUTLET 5-PSV-171 TO FLARE | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 12-5-PF411-A1/00 (SS) | Node 4 (OM) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 14-1-HC115-B2-H/00 | OUT PASS A & PASS B FUR 1-F-01 TO 1 PASS | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 14-5-P433-A1-H/00 | OUTL 5-T-20/21/22 TO SUCT 5-P-13A/B | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | 14-SWGR-B-MCC1/00 | SWGR MCC 6,6 kV-FIRE PUMP 2BF | Node 1 (CD II) | Fire Water Pump | MAH Confirmed · Existing Marker | Yes |
| RU VI Balongan | 16"Ø Under Buoy Hose (Existing Typical 2) | Node 2 (SPM&SPL) | Loading Hose Equipment | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 16"Ø Under Buoy Hose (New) | Node 2 (SPM&SPL) | Loading Hose Equipment | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 2" manual valve on spillback line pump | Node 3 (Spherical Tank) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 2"-5-SH435-B1A-H | LINE STEAM TO 5-T-20/21/22 | Node 4 (OM) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - |
| RU VII Kasim | 2-1-P118-A1-NI/00 | OUTL 1-EA-02&OUTL 1-LV-102 TO 5-T-05 | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 2-1-P118-A1-NI/00 (SS) | Node 1 (CDU) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 2-4-FG410-B1/00 | LINE START UP FUEL GAS | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 2-4-FG410-B1/00 (SS) | Node 4 (OM) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 2-5-FG490-A1A-H/00 | TANK 5-T-04 TO FUEL GAS HEADER | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 2-5-FG490-A1A-H/00 (SS) | Node 4 (OM) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 2-5-FG491-A1A-H/00 | OUTL TOP TANK 5-T-03 TO FUEL GAS | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 2-5-FG491-A1A-H/00 (SS) | Node 4 (OM) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 2-5-P401-A1-NI/00 | DISCH 1-P-02A/B LN 2-1-P142 TO 5-T-03/04 | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 2-5-P401-A1-NI/00 (SS) | Node 4 (OM) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 2-5-P404-A1-NI/00 | OUTLET TANK 5-T-03/04 TO INLET 5-FV-104 | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 2-5-P404-A1-NI/00 (SS) | Node 4 (OM) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 2-5-P405-A1-NI/00 | DISCH 5-P-17A/B TO INLET TANK 5-T-03/04 | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 2-5-P405-A1-NI/00 (SS) | Node 4 (OM) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 2-5-P406-A1-NI/00 | DISCHARGE 5-P-17A/B TO 4-E-11 | Node 4 (OM) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 2-5-P406-A1-NI/00 (SS) | Node 4 (OM) | Structural Support | Study Entity · Not Linked to Equipment Master | - |
Study Node Coverage
| RU | Phase | Node | Study Tag Rows |
|---|---|---|---|
| RU III Plaju | Phase 1 | Node 1 (CD II) | 164 |
| RU III Plaju | Phase 1 | Node 2 (CD III) | 88 |
| RU III Plaju | Phase 1 | Node 3 (CD IV) | 104 |
| RU III Plaju | Phase 2 | Node 04 (CDU V) | 110 |
| RU III Plaju | Phase 2 | Node-05 (STAB C) | 82 |
| RU III Plaju | Phase 2 | Node-07 (Alkylation) | 102 |
| RU III Plaju | Phase 2 | Node-08 (C4 Poly) | 78 |
| RU VI Balongan | Phase 1 | Node 3 (Spherical Tank) | 673 |
| RU VI Balongan | Phase 1 | Node 5 (Intermediate Tank) | 305 |
| RU VI Balongan | Phase 1 | Node 8 (EWTP) | 24 |
| RU VI Balongan | Phase 2 | Node 1 (Jetty) | 61 |
| RU VI Balongan | Phase 2 | Node 2 (SPM&SPL) | 27 |
| RU VI Balongan | Phase 2 | Node 4 (Feed Tanks) | 555 |
| RU VI Balongan | Phase 2 | Node 6 (Product Tanks) | 404 |
| RU VII Kasim | Phase 1 | Node 1 (CDU) | 144 |
| RU VII Kasim | Phase 1 | Node 2 (NHTU) | 19 |
| RU VII Kasim | Phase 2 | Node 3 (CRU) | 42 |
| RU VII Kasim | Phase 2 | Node 4 (OM) | 303 |
| RU VII Kasim | Phase 2 | Node 5-10 (Utility) | 18 |
| TOTAL | 3303 | ||
| Tag Number unik (setelah dedup) | 3236 |
Entity-Resolution Concentration
SECE elements with the highest count of study entities not exact-linked to Equipment Master.
| RU | SECE Element | Study Unique | Linked | Unlinked |
|---|---|---|---|---|
| RU VI Balongan | Pipework (Within Plant) | 396 | 167 | 229 |
| RU VI Balongan | Fixed Fire Water Distribution | 189 | 58 | 131 |
| RU VI Balongan | Flame Detector and Alarm | 129 | 0 | 129 |
| RU VI Balongan | Emergency Alarms (Siren) | 91 | 0 | 91 |
| RU VII Kasim | Structural Support | 55 | 0 | 55 |
| RU VI Balongan | IR Open Path Gas Detector | 52 | 0 | 52 |
| RU VI Balongan | Electrical Motor Control | 64 | 17 | 47 |
| RU VI Balongan | Motor Operated Valve (MOV, EIV) | 211 | 177 | 34 |
| RU VI Balongan | Inert Function | 65 | 33 | 32 |
| RU VI Balongan | Catalytic Point Gas Detector | 83 | 55 | 28 |
| RU VI Balongan | Pressure Safety Valve | 57 | 30 | 27 |
| RU VI Balongan | Cathodic Protection | 19 | 0 | 19 |