SECE Assurance & MAH Study Integration
Enterprise-level evidence, reconciliation and governance layer connecting the MAH SECE register to the Maintenance Strategy Portal without altering core maintenance logic.
Keep study evidence authoritative without turning it into an uncontrolled master-data overwrite
The MAH register is preserved as a separate evidence domain. Exact RU + tag matching creates traceable links to equipment; conflicts become governed reconciliation actions.
Study Coverage by RU
Reconciliation Logic
Exact RU + equipment tag match and current portal SECE marker is already present.
Action: Preserve existing core logic; evidence strengthens traceability.
Exact RU + equipment tag match but current portal SECE marker is not set.
Action: Do not auto-write. Raise controlled reconciliation/change request before core marker changes.
MAH study tag/entity has no exact RU + equipment match in the uploaded master.
Action: Classify as equipment, FLOC, line, system/facility barrier element, formatting issue, or genuine master-data gap.
Current portal SECE marker exists, but the equipment is absent from the currently uploaded MAH study register.
Action: Do not demote. Preserve marker until study scope and evidence are reconciled.
SECE Study Register · Unique Tags
Study records are searchable without forcing them into the equipment model.
| RU | Tag | Name (Study) | Node(s) | SECE Element(s) | Status | Linked |
|---|---|---|---|---|---|---|
| RU VII Kasim | 5-EMT-E-3/00 | EMT-ESE JETTY II HEAD | Node 4 (OM) | Lightning Protection Tower and Air Terminal | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-GD-001/00 | GAS DETECTOR | Node 4 (OM) | IR Gas Detector | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-GD-002/00 | GAS DETECTOR | Node 4 (OM) | IR Gas Detector | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-GD-003/00 | GAS DETECTOR | Node 4 (OM) | IR Gas Detector | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-GD-004/00 | GAS DETECTOR | Node 4 (OM) | IR Gas Detector | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-GD-005/00 | GAS DETECTOR | Node 4 (OM) | IR Gas Detector | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-GD-006/00 | GAS DETECTOR | Node 4 (OM) | IR Gas Detector | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-GD-010/00 | GAS DETECTOR | Node 4 (OM) | IR Gas Detector | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-GD-012/00 | GAS DETECTOR | Node 4 (OM) | IR Gas Detector | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LI-453/00 | AUTOMATIC TANK GAUGE TANK SIDE AT 5-T-07 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LI-454/00 | AUTOMATIC TANK GAUGE TANK SIDE AT 5-T-08 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LI-461/00 | AUTOMATIC TANK GAUGE TANK SIDE AT 5-T-26 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LPS-E-1/00 | FSM-ESE LATTICE TWR AT BFW TK | Node 4 (OM) | Lightning Protection Tower and Air Terminal | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LPS-E-2/00 | FSM-ESE-(W/ LATTICE TOWER) SLOP OIL TANK | Node 4 (OM) | Lightning Protection Tower and Air Terminal | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LPS-E-3/00 | FSM-ESE-(WITH LATTICE TOWER) RESIDU TANK | Node 4 (OM) | Lightning Protection Tower and Air Terminal | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LPS-E-4/00 | FSM-ESE-(WITH LATTICE TOWER) RESIDU TANK | Node 4 (OM) | Lightning Protection Tower and Air Terminal | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LPS-E-5/00 | FSM-ESE-(WITH LATTICE TOWER) DIESEL TANK | Node 4 (OM) | Lightning Protection Tower and Air Terminal | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LPS-E-6/00 | FSM-ESE-(W/ LATTICE TOWER) GASOLINE TANK | Node 4 (OM) | Lightning Protection Tower and Air Terminal | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LPS-E-7/00 | FSM-ESE-(W/ LATTICE TOWER) CRUDE 5-T-26 | Node 4 (OM) | Lightning Protection Tower and Air Terminal | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-428/00 | LEVEL SWITCH HIGH HIGH AT 5-T-03 | Node 4 (OM) | Level Initiator | MAH Confirmed · Existing Marker | Yes |
| RU VII Kasim | 5-LSHH-429/00 | LEVEL SWITCH HIGH HIGH AT 5-T-04 | Node 4 (OM) | Level Initiator | MAH Confirmed · Existing Marker | Yes |
| RU VII Kasim | 5-LSHH-470/00 | LEVEL SWITCH HIGH HIGH AT 5-T-01 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-471/00 | LEVEL SWITCH HIGH HIGH AT 5-T-02 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-472/00 | LEVEL SWITCH HIGH HIGH AT 5-T-13 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-473/00 | LEVEL SWITCH HIGH HIGH AT 5-T-14 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-474/00 | LEVEL SWITCH HIGH HIGH AT 5-T-15 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-475/00 | LEVEL SWITCH HIGH HIGH AT 5-T-16 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-476/00 | LEVEL SWITCH HIGH HIGH AT 5-T-17 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-477/00 | LEVEL SWITCH HIGH HIGH AT 5-T-18 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-478/00 | LEVEL SWITCH HIGH HIGH AT 5-T-20 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-479/00 | LEVEL SWITCH HIGH HIGH AT 5-T-21 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-480/00 | LEVEL SWITCH HIGH HIGH AT 5-T-22 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-483/00 | LEVEL SWITCH HIGH HIGH AT 5-T-25 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LSHH-484/00 | LEVEL SWITCH HIGH HIGH AT 5-T-26 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LT-401/00 | 5-T-03 LIGHT NAPH SPHERE LVL TRANSMITTER | Node 4 (OM) | Level Initiator | MAH Confirmed · Existing Marker | Yes |
| RU VII Kasim | 5-LT-403/00 | 5-T-04 LIGHT NAPH SPHERE LVL TRANSMITTER | Node 4 (OM) | Level Initiator | MAH Confirmed · Existing Marker | Yes |
| RU VII Kasim | 5-LT-443/00 | AUTOMATIC TANK GAUGE LEVEL INT AT 5-T-01 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LT-444/00 | AUTOMATIC TANK GAUGE LEVEL INT AT 5-T-02 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-LT-460/00 | AUTOMATIC TANK GAUGE LEVEL INT AT 5-T-25 | Node 4 (OM) | Level Initiator | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 5-MCC-PM-01A/00 | MCC FOR CRUDE CHARGE PUMP A MOTOR | Node 1 (CDU) | Electrical Motor Control | MAH Identified · Marker Reconciliation | Yes |
Study Node Coverage
| RU | Phase | Node | Study Tag Rows |
|---|---|---|---|
| RU III Plaju | Phase 1 | Node 1 (CD II) | 164 |
| RU III Plaju | Phase 1 | Node 2 (CD III) | 88 |
| RU III Plaju | Phase 1 | Node 3 (CD IV) | 104 |
| RU III Plaju | Phase 2 | Node 04 (CDU V) | 110 |
| RU III Plaju | Phase 2 | Node-05 (STAB C) | 82 |
| RU III Plaju | Phase 2 | Node-07 (Alkylation) | 102 |
| RU III Plaju | Phase 2 | Node-08 (C4 Poly) | 78 |
| RU VI Balongan | Phase 1 | Node 3 (Spherical Tank) | 673 |
| RU VI Balongan | Phase 1 | Node 5 (Intermediate Tank) | 305 |
| RU VI Balongan | Phase 1 | Node 8 (EWTP) | 24 |
| RU VI Balongan | Phase 2 | Node 1 (Jetty) | 61 |
| RU VI Balongan | Phase 2 | Node 2 (SPM&SPL) | 27 |
| RU VI Balongan | Phase 2 | Node 4 (Feed Tanks) | 555 |
| RU VI Balongan | Phase 2 | Node 6 (Product Tanks) | 404 |
| RU VII Kasim | Phase 1 | Node 1 (CDU) | 144 |
| RU VII Kasim | Phase 1 | Node 2 (NHTU) | 19 |
| RU VII Kasim | Phase 2 | Node 3 (CRU) | 42 |
| RU VII Kasim | Phase 2 | Node 4 (OM) | 303 |
| RU VII Kasim | Phase 2 | Node 5-10 (Utility) | 18 |
| TOTAL | 3303 | ||
| Tag Number unik (setelah dedup) | 3236 |
Entity-Resolution Concentration
SECE elements with the highest count of study entities not exact-linked to Equipment Master.
| RU | SECE Element | Study Unique | Linked | Unlinked |
|---|---|---|---|---|
| RU VI Balongan | Pipework (Within Plant) | 396 | 167 | 229 |
| RU VI Balongan | Fixed Fire Water Distribution | 189 | 58 | 131 |
| RU VI Balongan | Flame Detector and Alarm | 129 | 0 | 129 |
| RU VI Balongan | Emergency Alarms (Siren) | 91 | 0 | 91 |
| RU VII Kasim | Structural Support | 55 | 0 | 55 |
| RU VI Balongan | IR Open Path Gas Detector | 52 | 0 | 52 |
| RU VI Balongan | Electrical Motor Control | 64 | 17 | 47 |
| RU VI Balongan | Motor Operated Valve (MOV, EIV) | 211 | 177 | 34 |
| RU VI Balongan | Inert Function | 65 | 33 | 32 |
| RU VI Balongan | Catalytic Point Gas Detector | 83 | 55 | 28 |
| RU VI Balongan | Pressure Safety Valve | 57 | 30 | 27 |
| RU VI Balongan | Cathodic Protection | 19 | 0 | 19 |