SECE Assurance & MAH Study Integration
Enterprise-level evidence, reconciliation and governance layer connecting the MAH SECE register to the Maintenance Strategy Portal without altering core maintenance logic.
Keep study evidence authoritative without turning it into an uncontrolled master-data overwrite
The MAH register is preserved as a separate evidence domain. Exact RU + tag matching creates traceable links to equipment; conflicts become governed reconciliation actions.
Study Coverage by RU
Reconciliation Logic
Exact RU + equipment tag match and current portal SECE marker is already present.
Action: Preserve existing core logic; evidence strengthens traceability.
Exact RU + equipment tag match but current portal SECE marker is not set.
Action: Do not auto-write. Raise controlled reconciliation/change request before core marker changes.
MAH study tag/entity has no exact RU + equipment match in the uploaded master.
Action: Classify as equipment, FLOC, line, system/facility barrier element, formatting issue, or genuine master-data gap.
Current portal SECE marker exists, but the equipment is absent from the currently uploaded MAH study register.
Action: Do not demote. Preserve marker until study scope and evidence are reconciled.
SECE Study Register · Unique Tags
Study records are searchable without forcing them into the equipment model.
| RU | Tag | Name (Study) | Node(s) | SECE Element(s) | Status | Linked |
|---|---|---|---|---|---|---|
| RU III Plaju | 83-FGGD-907/00 | POINT TYPE GAS DETECTOR 2-1/4-11 | Node 2 (CD III) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-FGGD-908/00 | POINT TYPE GAS DETECTOR 2-3/5-5 | Node 2 (CD III) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-FGGD-909/00 | POINT TYPE GAS DETECTOR 8-4 CD3 | Node 2 (CD III) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-HS-001 | Node 2 (CD III) | Manual Push Button | Study Entity · Not Linked to Equipment Master | - | |
| RU III Plaju | 83-IPFS-LL/00 | FSLL CDU 3 | Node 2 (CD III) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-MCC-PM-001/00 | LV CONTROL MOTOR PM-001 | Node 2 (CD III) | Electrical Motor Control | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | 83-OPGD-901AB/00 | OPEN PATH GAS DET. CO PUMP HOUSE 901 | Node 2 (CD III) | IR Open Path Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-OPGD-902AB/00 | OPEN PATH GAS DET. NEAR HO PUMP HOUSE | Node 2 (CD III) | IR Open Path Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-OPGD-903AB/00 | OPEN PATH GAS DET. NEAR ACCUM. TANK 903 | Node 2 (CD III) | IR Open Path Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-OPGD-904AB/00 | OPEN PATH GAS DET. NEAR FURNACE 904 | Node 2 (CD III) | IR Open Path Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-770-4/00 | Line Pompa 11/12 to Furnace-I (F1C1) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-770-6/00 | Line Pompa 11/12 to Furnace-I (F1C1) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-770-8/00 | Line Pompa 11/12 to Furnace-I (F1C1) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-800-3/00 | Line P. 2/3/4/5/6 to Furnace-II (F2C1) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-800-4/00 | Line P. 2/3/4/5/6 to Furnace-II (F2C1) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-800-6/00 | Line P. 2/3/4/5/6 to Furnace-II (F2C1) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-810-3/00 | Line P. 2/3/4/5/6 to Furnace-I (F1C2) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-810-6/00 | Line P. 2/3/4/5/6 to Furnace-I (F1C2) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-810-8/00 | Line P. 2/3/4/5/6 to Furnace-I (F1C2) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-870-4/00 | Line P. 5/9/9A/10 to Furnace-II (F2C2) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 83-PICA-870-6/00 | Line P. 5/9/9A/10 to Furnace-II (F2C2) | Node 2 (CD III) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-ANC-01/00 | ANNUNCIATOR | Node 3 (CD IV) | Local Annunciator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-CR-1/00 | OVERHEAD CRANE 84-CR-1 | Node 3 (CD IV) | Lifting Equipment / Devices | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-CR-GG-1/00 | GEAR BOX OVERHEAD CRANE | Node 3 (CD IV) | Lifting Equipment / Devices | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-CR-M-1/00 | ELECTRIC MOTOR FOR CRANE 84-CR-1 | Node 3 (CD IV) | Lifting Equipment / Devices | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-801/00 | FLAME DET. NW SIDE HO PUMP HOUSE | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-802/00 | FLAME DET. SE SIDE HO PUMP HOUSE | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-803/00 | FLAME DET. REBOILER 6-11/12 | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-804/00 | FLAME DET. EAST SIDE COLUMN AREA | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-805/00 | FLAME DET. SW SIDE CO PUMP HOUSE | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-806/00 | FLAME DET. NW SIDE CO PUMP HOUSE | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-807/00 | FLAME DET. SOUTH SIDE CO PUMP HOUSE 807 | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-808/00 | FLAME DET. NE SIDE CO PUMP HOUSE | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGFD-809/00 | FLAME DET. SE SIDE CO PUMP HOUSE | Node 3 (CD IV) | Flame Detector and Alarm | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGGD-901/00 | POINT TYPE GAS DETECTOR P-2/5 | Node 3 (CD IV) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGGD-902/00 | POINT TYPE GAS DETECTOR P-7/8 | Node 3 (CD IV) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGGD-903/00 | POINT TYPE GAS DETECTOR P-10/11 | Node 3 (CD IV) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGGD-904/00 | POINT TYPE GAS DETECTOR 2-3/5-3 | Node 3 (CD IV) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGGD-905/00 | POINT TYPE GAS DETECTOR 5-9/4-12 | Node 3 (CD IV) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 84-FGGD-906/00 | POINT TYPE GAS DETECTOR P-19 | Node 3 (CD IV) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
Study Node Coverage
| RU | Phase | Node | Study Tag Rows |
|---|---|---|---|
| RU III Plaju | Phase 1 | Node 1 (CD II) | 164 |
| RU III Plaju | Phase 1 | Node 2 (CD III) | 88 |
| RU III Plaju | Phase 1 | Node 3 (CD IV) | 104 |
| RU III Plaju | Phase 2 | Node 04 (CDU V) | 110 |
| RU III Plaju | Phase 2 | Node-05 (STAB C) | 82 |
| RU III Plaju | Phase 2 | Node-07 (Alkylation) | 102 |
| RU III Plaju | Phase 2 | Node-08 (C4 Poly) | 78 |
| RU VI Balongan | Phase 1 | Node 3 (Spherical Tank) | 673 |
| RU VI Balongan | Phase 1 | Node 5 (Intermediate Tank) | 305 |
| RU VI Balongan | Phase 1 | Node 8 (EWTP) | 24 |
| RU VI Balongan | Phase 2 | Node 1 (Jetty) | 61 |
| RU VI Balongan | Phase 2 | Node 2 (SPM&SPL) | 27 |
| RU VI Balongan | Phase 2 | Node 4 (Feed Tanks) | 555 |
| RU VI Balongan | Phase 2 | Node 6 (Product Tanks) | 404 |
| RU VII Kasim | Phase 1 | Node 1 (CDU) | 144 |
| RU VII Kasim | Phase 1 | Node 2 (NHTU) | 19 |
| RU VII Kasim | Phase 2 | Node 3 (CRU) | 42 |
| RU VII Kasim | Phase 2 | Node 4 (OM) | 303 |
| RU VII Kasim | Phase 2 | Node 5-10 (Utility) | 18 |
| TOTAL | 3303 | ||
| Tag Number unik (setelah dedup) | 3236 |
Entity-Resolution Concentration
SECE elements with the highest count of study entities not exact-linked to Equipment Master.
| RU | SECE Element | Study Unique | Linked | Unlinked |
|---|---|---|---|---|
| RU VI Balongan | Pipework (Within Plant) | 396 | 167 | 229 |
| RU VI Balongan | Fixed Fire Water Distribution | 189 | 58 | 131 |
| RU VI Balongan | Flame Detector and Alarm | 129 | 0 | 129 |
| RU VI Balongan | Emergency Alarms (Siren) | 91 | 0 | 91 |
| RU VII Kasim | Structural Support | 55 | 0 | 55 |
| RU VI Balongan | IR Open Path Gas Detector | 52 | 0 | 52 |
| RU VI Balongan | Electrical Motor Control | 64 | 17 | 47 |
| RU VI Balongan | Motor Operated Valve (MOV, EIV) | 211 | 177 | 34 |
| RU VI Balongan | Inert Function | 65 | 33 | 32 |
| RU VI Balongan | Catalytic Point Gas Detector | 83 | 55 | 28 |
| RU VI Balongan | Pressure Safety Valve | 57 | 30 | 27 |
| RU VI Balongan | Cathodic Protection | 19 | 0 | 19 |