Portal›Task List Library
Standard Maintenance Task List
Corporate maintenance task master. Each task retains work purpose, trigger, execution mode, acceptance criteria and reference standard.
Tasklist Master314 tasks
| Task ID | Equipment Group | Discipline | Strategy Element | Task / Purpose | Frequency | Condition | SAP Execution | Reference |
|---|---|---|---|---|---|---|---|---|
| IN-CONTROL-VALVE-CM-02 | Control Valve / Final Control Element | INST | Condition / Performance Monitoring | Control Valve Signature / Friction / Travel Diagnostic Control Valve Signature / Friction / Travel Diagnostic | Condition / Diagnostic | ONLINE | 01 - MONITORING ONLY | OEM / performance / IEC 61511 if SIF |
| IN-ESD-FINAL-FT-02 | ESD Final Element / Solenoid / Shutoff Valve | INST | Functional / Proof / Performance Test | ESD Valve Partial / Full Stroke Proof Test ESD Valve Partial / Full Stroke Proof Test | SIL Proof-Test Due | ONLINE / SHUTDOWN | 03 - PACKAGE WO | IEC 61511 / SRS / OEM |
| IN-CONTROL-SYS-FT-02 | DCS / PLC / SIS / Control System | INST | Functional / Proof / Performance Test | SIS Logic Solver / SIF Proof Test SIS Logic Solver / SIF Proof Test | SIL Proof-Test Due | CONTROLLED TEST / SHUTDOWN | 03 - PACKAGE WO | IEC 61511 / SRS |
| IN-CONTROL-SYS-PM-01 | DCS / PLC / SIS / Control System | INST | Preventive Maintenance | DCS / PLC / Control System Backup / Redundancy / Hardware Health Check DCS / PLC / Control System Backup / Redundancy / Hardware Health Check | Periodic / Change Event | ONLINE | 02 - NOTIFICATION ONLY | IEC 61511 for SIS / OEM / cyber governance |
| IN-FG-FT-02 | Fire & Gas Detection / Alarm / Deluge Logic | INST | Functional / Proof / Performance Test | Fire & Gas Detector Bump / Functional Response Test Fire & Gas Detector Bump / Functional Response Test | Test Due | ONLINE | 02 - NOTIFICATION ONLY | NFPA 72 / OEM / site fire philosophy |
| IN-METERING-FT-02 | Metering / Custody Transfer System | INST | Functional / Proof / Performance Test | Custody Meter Proving / Performance Verification Custody Meter Proving / Performance Verification | Proving / Metrology Due | ONLINE | 03 - PACKAGE WO | API MPMS / applicable metrology regulation |
| IN-ANALYZER-PM-01 | Online / Laboratory Analyzer | INST | Preventive Maintenance | Analyzer Sample System Preventive Service Analyzer Sample System Preventive Service | OEM / Condition | ONLINE | 03 - PACKAGE WO | OEM / ISO 17025 where applicable |
| SF-FIRE-INS-01 | Fire Fighting / Fire Water / Foam Equipment | FIRE | Inspection / Integrity | Fire Fighting / Fire Water System Routine Inspection Fire Fighting / Fire Water System Routine Inspection | Periodic / Condition | ONLINE | 02 - NOTIFICATION ONLY | NFPA 25 / applicable fire code / OEM |
| SF-FIRE-PM-01 | Fire Fighting / Fire Water / Foam Equipment | FIRE | Preventive Maintenance | Fire Fighting / Fire Water System Preventive Service Fire Fighting / Fire Water System Preventive Service | OEM / Usage / Condition | ONLINE / SHUTDOWN | 03 - PACKAGE WO | NFPA 25 / applicable fire code / OEM |
| SF-FIRE-FT-01 | Fire Fighting / Fire Water / Foam Equipment | FIRE | Functional / Proof / Performance Test | Fire Fighting / Fire Water System Functional / Readiness Test Fire Fighting / Fire Water System Functional / Readiness Test | Test Due / Condition | ONLINE / CONTROLLED TEST | 02 - NOTIFICATION ONLY | NFPA 25 / applicable fire code / OEM |
| SF-FIRE-OVH-01 | Fire Fighting / Fire Water / Foam Equipment | FIRE | Restoration / Overhaul | Fire Fighting / Fire Water System Condition-Triggered Repair / Restoration Fire Fighting / Fire Water System Condition-Triggered Repair / Restoration | Condition Triggered | SHUTDOWN | 04 - INDIVIDUAL WO | NFPA 25 / applicable fire code / OEM |
| UT-HVAC-INS-01 | HVAC / Refrigeration / Chiller | HVAC | Inspection / Integrity | HVAC / Refrigeration / Chiller Routine Inspection HVAC / Refrigeration / Chiller Routine Inspection | Periodic / Condition | ONLINE | 02 - NOTIFICATION ONLY | OEM / condition / refrigerant rules |
| UT-HVAC-PM-01 | HVAC / Refrigeration / Chiller | HVAC | Preventive Maintenance | HVAC / Refrigeration / Chiller Preventive Service HVAC / Refrigeration / Chiller Preventive Service | OEM / Usage / Condition | ONLINE / SHUTDOWN | 03 - PACKAGE WO | OEM / condition / refrigerant rules |
| UT-HVAC-FT-01 | HVAC / Refrigeration / Chiller | HVAC | Functional / Proof / Performance Test | HVAC / Refrigeration / Chiller Functional / Readiness Test HVAC / Refrigeration / Chiller Functional / Readiness Test | Test Due / Condition | ONLINE / CONTROLLED TEST | 02 - NOTIFICATION ONLY | OEM / condition / refrigerant rules |
| UT-HVAC-OVH-01 | HVAC / Refrigeration / Chiller | HVAC | Restoration / Overhaul | HVAC / Refrigeration / Chiller Condition-Triggered Repair / Restoration HVAC / Refrigeration / Chiller Condition-Triggered Repair / Restoration | Condition Triggered | SHUTDOWN | 04 - INDIVIDUAL WO | OEM / condition / refrigerant rules |
| ME-LIFTING-INS-01 | Crane / Elevator / Lifting Device | LIFT | Inspection / Integrity | Lifting Equipment Routine Inspection Lifting Equipment Routine Inspection | Periodic / Condition | ONLINE | 02 - NOTIFICATION ONLY | Statutory lifting rules / OEM |
| ME-LIFTING-PM-01 | Crane / Elevator / Lifting Device | LIFT | Preventive Maintenance | Lifting Equipment Preventive Service Lifting Equipment Preventive Service | OEM / Usage / Condition | ONLINE / SHUTDOWN | 03 - PACKAGE WO | Statutory lifting rules / OEM |
| ME-LIFTING-FT-01 | Crane / Elevator / Lifting Device | LIFT | Functional / Proof / Performance Test | Lifting Equipment Functional / Readiness Test Lifting Equipment Functional / Readiness Test | Test Due / Condition | ONLINE / CONTROLLED TEST | 02 - NOTIFICATION ONLY | Statutory lifting rules / OEM |
| ME-LIFTING-OVH-01 | Crane / Elevator / Lifting Device | LIFT | Restoration / Overhaul | Lifting Equipment Condition-Triggered Repair / Restoration Lifting Equipment Condition-Triggered Repair / Restoration | Condition Triggered | SHUTDOWN | 04 - INDIVIDUAL WO | Statutory lifting rules / OEM |
| ME-MOBILE-INS-01 | Mobile / Earth Moving / Transport Equipment | MOBILE | Inspection / Integrity | Mobile / Transport Equipment Routine Inspection Mobile / Transport Equipment Routine Inspection | Periodic / Condition | ONLINE | 02 - NOTIFICATION ONLY | OEM / statutory vehicle rules |
| ME-MOBILE-PM-01 | Mobile / Earth Moving / Transport Equipment | MOBILE | Preventive Maintenance | Mobile / Transport Equipment Preventive Service Mobile / Transport Equipment Preventive Service | OEM / Usage / Condition | ONLINE / SHUTDOWN | 03 - PACKAGE WO | OEM / statutory vehicle rules |
| ME-MOBILE-FT-01 | Mobile / Earth Moving / Transport Equipment | MOBILE | Functional / Proof / Performance Test | Mobile / Transport Equipment Functional / Readiness Test Mobile / Transport Equipment Functional / Readiness Test | Test Due / Condition | ONLINE / CONTROLLED TEST | 02 - NOTIFICATION ONLY | OEM / statutory vehicle rules |
| ME-MOBILE-OVH-01 | Mobile / Earth Moving / Transport Equipment | MOBILE | Restoration / Overhaul | Mobile / Transport Equipment Condition-Triggered Repair / Restoration Mobile / Transport Equipment Condition-Triggered Repair / Restoration | Condition Triggered | SHUTDOWN | 04 - INDIVIDUAL WO | OEM / statutory vehicle rules |
| CV-CIVIL-INS-01 | Civil / Building / Road / Drain / Structure | CIVL | Inspection / Integrity | Civil / Building / Infrastructure Routine Inspection Civil / Building / Infrastructure Routine Inspection | Periodic / Condition | ONLINE | 02 - NOTIFICATION ONLY | Civil integrity programme / statutory |
| CV-CIVIL-PM-01 | Civil / Building / Road / Drain / Structure | CIVL | Preventive Maintenance | Civil / Building / Infrastructure Preventive Service Civil / Building / Infrastructure Preventive Service | OEM / Usage / Condition | ONLINE / SHUTDOWN | 03 - PACKAGE WO | Civil integrity programme / statutory |
Halaman 11 / 13