Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU II Dumai · 6201
920-T-2/00
6 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| C587901164 | FITTING | NOZ,PUMP OUT,W/ DOWN ELBOW DWG.A2-2202-252-5 | 1 | PCS | 1 | - |
| C587901167 | FLANGE | NOZ,SUCTION,FLANGE 14"150# DWG.A2-2202-252-5 | 1 | PCS | 1 | - |
| H260901063 | FITTING | ELBOW,4"150#,DWG.A2-2202-252-5 DWG.A2-2202-252-5 | 1 | PCS | 1 | - |
| I090912330 | BOLT / STUD / NUT | BOLT,STUD,Ø1 1/8"LG 6 1/4",B7/2H,W/2 NU DWG.A2-2203-219-G,IT.F | 40 | PCS | 1 | - |
| J200750200 | GASKET | GASKET,SW,304SS,# 150, 20 IN DWG.A2-2202-225-4,IT.E | 1 | PCS | 1 | - |
| J200750546 | GASKET | GASKET,SW SS 304 ASB OR CS 150LB 24IN DOC.NO.113V-346-04 | 2 | PCS | 1 | - |